Similar Projects
Shoulder Widening, Mill, AC Resurfacing, Replace Str Bridge, Approach Grading, Pipework; Signal, Crossing Surface
Infrastructure
Conception
$11,673,000 CJ est. value
Elkton, SD 57026

Shoulder Widening, Mill, AC Resurfacing, Replace Str Bridge, Approach Grading, Pipework; Signal, Crossing Surface
Infrastructure
Conception
$11,673,000 CJ est. value
Elkton, SD 57026

Tall Grass Parkway Multi-Residential Development
New Construction, Infrastructure
Design
$35,000,000 CJ est. value
Brookings, SD 57006

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Road Materials
Term Contract
Post-Bid
SD

Asphalt Surface Treatment
Infrastructure
Results

Bridge Deck Sweeping in the Watertown Area
Infrastructure
Results
Watertown, SD

2022 Bond - Brookings School District
New Construction, Build-out, Infrastructure
Pending Verification
$23,000,000 CJ est. value
Brookings, SD 57006

34th Avenue Mixed-Use Development
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Brookings, SD 57006

City Hall - City of Aurora
Demolition, New Construction, Infrastructure
Conception
$1,000,000 CJ est. value
Aurora, SD 57002

Road Maintenance
Term Contract
Post-Bid
SD

Asphalt Concrete Surfacing
Infrastructure
Results
$1,700,000 est. value
SD

Morningside Addition
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Brookings, SD 57006

AC Resurfacing - I 29
Infrastructure
Conception
$8,918,000 CJ est. value
Brookings, SD 57006

Airport Pavement Maintenance Project
Infrastructure
Post-Bid

Last Updated 06/16/2023 07:03 AM
Project Title

Approach Slab Repair, Replace Joint, Polymer Chip Seal, PCC Pavement Grinding, Joint and Spall Repair

Physical Address View project details and contacts
City, State (County) Bruce, SD 57220   (Brookings County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $9,531,299 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Approach Slab Repair, Replace Joint, Polymer Chip Seal, PCC Pavement Grinding, Joint & Spall Repair Interstate 29 NBL, US Highways 14, 81 & 212; SD Highways 15 & 22 In Brookings, Codington, Deuel, Hamlin, Kingsbury Counties Field Work Completion: October 18, 2024 Various Locations Throughout the Watertown Area Contract Id: 9098 SDDOT - 02 - Approach Slab Repair, Replace Joint, Polymer Chip Seal, PCC Pavement Grinding, Joint and Spall Repair MBE (0.8%), WBE (6.9%) Str.No-29-222-050

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents