Similar Projects
Donor Wall Design & Installation
Post-Bid
Harrisburg, PA

Italian Citizens Enjoyment Club Exterior Work
Post-Bid
Pittston, PA 18640

Jefferson Municipal Building Renovation Siding & Facade
Results
Washington, PA

Improvements to Sharps Landing
Results
Less than $50,000 est. value
Sharpsburg, PA

Modular Block Wall System Construction (Cd)
Post-Bid
Pittsburgh, PA

Foundation Repair
Results
PA

Sub B and B Stadium Station Project
- 4,173 SF
Post-Bid
Less than $25,000 est. value
Philadelphia, PA

High School Auditorium Acoustic Panels and Installation
Results
Middletown, PA

Pre-Assembled Metal Lockers and Benches
Post-Bid
Less than $25,000 est. value
Philadelphia, PA

Siding Replacement
Results
New Castle, PA

Facade Renovation for the University Park Airport
Post-Bid
State College, PA

Abeloff Plaster Ceiling Repairs
Results
East Stroudsburg, PA

DLLCC - Curtain Wall and Glass Wall Joint Replacement
Post-Bid
Less than $300,000 est. value
Pittsburgh, PA

Standard Boarding Up of Commercial and Residential Properties
Results
Less than $25,000 est. value
Allentown, PA 18101

Carnegie Free Library of McKeesport Parking Lot
Renovation
Post-Bid
Carnegie, PA 15106

Last Updated 05/30/2019 09:06 AM
Project Title

Rehabilitate Control Tower Catwalk and Ladders/Railings

Physical Address View project details and contacts
City, State (County) New Cumberland, PA 17070   (Cumberland County)
Category(s) Single Trades
Sub-Category(s) Finishes/Exterior, Finishes/Interior
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description The scope of work is associated with proposed improvements to the control tower and catwalk at the Terminal Building. Specifically, these improvements include the replacement of the existing railing on the roof of the tower cab, the ladder from the upper roof to the tower cab, and the ladder from the lower to upper roof to meet OSHA requirements. Each proposal must be enclosed in a s ealed envelope addressed as noted above and marked on the outside with the name and number of the contract and delivered at the place and time set forth above and not after.
Details
Division 09 - Finishes.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents