Similar Projects
Terminal A Renovation Phase III, Front Door Modernization
Post-Bid
Less than $4,200,000 est. value
San Antonio, TX 78216

Overhead Door Maintenance San Antonio District
Term Contract
Post-Bid
San Antonio, TX 78229

ATC Tower Glass Replacement
Results
San Antonio, TX 78234

Replace SCIF Doors
Results
$25,000 to $100,000 est. value
San Antonio, TX 78253

John Peace Library (JPL) Replace Exterior with Windows
Post-Bid
$2,000,000 est. value
San Antonio, TX 78275

Construction of Door of Equality Art Structure
Results
San Antonio, TX 78204

Fire Door Repairs
Post-Bid
San Antonio, TX

Job Order Contract (JOC) for as Needed Commercial Glass Repairs and Renovations
Results
$75,000 est. value
San Antonio, TX 78200

Purchase and Installation of Overhead Door Operators at Saws Steven M Clouse Recycle Center Fleet Building
Results
San Antonio, TX 78212

Human Resources Security Upgrades
Results
Less than $49,646 est. value
San Antonio, TX 78204

Annual Contract for Building Glass Maintenance and Replacement
Term Contract
Results
San Antonio, TX 78283

Driver Barrier Door Installation
Results
San Antonio, TX 78212

Window Tinting
Results
San Antonio, TX 78257

Old Paint Shop Rollup Doors Modifications
Results
Less than $68,888 est. value
San Antonio, TX 78212

Touchless Doors Upgrades Project
Results
Less than $135,172 est. value
San Antonio, TX 78204

Last Updated 06/08/2021 08:18 AM
Project Title

ACS Kennel Door Upgrade

Physical Address View project details and contacts
City, State (County) San Antonio, TX 78275   (Bexar County)
Category(s) Single Trades
Sub-Category(s) Windows/Doors
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $398,720
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of work included for Kennel 1, 3, 4 is as follows: Demo and install new stainless steel gates, with magnetic latches that self closes and secondary security latch that can be pinned or locked, wire mesh tops, and stainless steel guillotine door with premium counter balance with adjustable stops. Patch and repair floor where posts have been removed using chipping hammer to remove any remaining unsound coating/concrete, prime, install trowel down colored quartz mortar and topcoat each patch with Accelera-Hybrid Urethane topcoat.

Details

Division 08 - Openings, Doors and Frames, Windows.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents