Similar Projects
Trail Maintenance Shop & Wildlife Center
New Construction
Bidding
Orange Beach, AL 36561

Nichols Replacement of Three Greenhouses
Post-Bid
Fairhope, AL 36532

Greenhouses for Bryant
Post-Bid
Tuscaloosa, AL 35403

Construction of EDS for Aquatic Animal Research Lab, Auburn, AL
New Construction
Results
Auburn, AL 36832

Construction of a New Baldwin County Animal Shelter Intake Building
New Construction - 13,677 SF
Results
Less than $3,564,024 est. value
Summerdale, AL 36580

Easyvet Clinic
Renovation - 1,345 SF
Construction
Birmingham, AL 35242

Movable Rain-Out Shelters with Automated Retractable Roofs
Alteration
Post-Bid
Auburn, AL

Isolation Kennel for the Mobile County Animal Shelter
New Construction - 1,783 SF
Results
$684,720 est. value
Mobile, AL 36618

Renovated Facility for Marshall County Animal Shelter
Renovation
Post-Bid
AL

New Greenhouse UA Arboretum
Results
Less than $307,000 est. value
Tuscaloosa, AL 35487

Section Street Repair of Existing Greenhouse
Results
Fairhope, AL 36532

Labor to Assemble and Erect Three Greenhouses
Results
Fairhope, AL 36532

Animal Services Center Renovation Phase 3
Renovation
Results
$1,255,000 est. value
AL 35805

Greenhouse Replacement
New Construction
Results
Gulf Shores, AL 36542

Modernize Fish Houses #55 and #59-Auburn, AL
New Construction, Demolition
Results
$500,000 to $1,000,000 est. value
Auburn, AL

Reported 02/02/2022 10:58 AM
Project Title

New Baldwin County Animal Shelter Intake Building

Physical Address View project details and contacts
City, State (County) Summerdale, AL 36580   (Baldwin County)
Category(s) Animal/Plant/Fish Facility
Sub-Category(s) Animal/Plant/Fish Facility
Contracting Method
Project Status Construction Commenced, Construction Commenced first quarter 2022
Bids Due View project details and contacts
Estimated Value $4,584,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work consists of constructing a New Baldwin County Animal Shelter Intake Building, complete as shown on the Drawings and in accordance with these Specifications. Only General Contractors who have completed the prequalification process and previously selected by the Baldwin County Commission, and which are properly licensed in accordance with criteria established by the State Licensing Board for General Contractors under the Provision of Title 34, Chapter 8, Code of Alabama, 1975, as amended, will be eligible for the Work of this project.

Details

1 Animal/Plant/Fish Facility, 13,677 SF New Construction.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Carpeting, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents