Similar Projects
WRF South Reuse Pump Station
Renovation
Bidding
Deland, FL

Hope Place Lift Station Replacement
Results
Less than $128,000 est. value
Holly Hill, FL

Wilmette Avenue Stormwater Pump Station
Results
Less than $305,904 est. value
Ormond Beach, FL 32173

Kmart Pump Station Improvements
Results
Less than $585,000 est. value
De Land, FL 32720

Ponce Inlet Lift Station Building Remodel
Results
Less than $150,000 est. value
Ponce Inlet, Port Orange, FL 32127

LPGA Lift Station 97 Rehabilitation
Results
$714,510 to $924,660 est. value
Daytona Beach, FL

Phase 4B Lake Monroe Intake, Pump Station and Raw Water Transmission Main Project
New Construction
Results
$10,000,000 est. value
Deltona, FL

NW Reclaimed Water Storage Tank and Pump Station
Results
DeLand, FL

Lift Station Maintenance and Repair
Results
Daytona Beach, DeBary, DeLand, Oak Hill, Orange City, Ormond Beach, Ponce Inlet, Port Orange, FL 32124

Herbert and Nova Master Lift Station Rehabilitation
Results
$890,000 est. value
Port Orange, FL

Smyrna Dunes Park Lift Station and Septic Abandonment
New Construction
Results
$349,140 est. value
Daytona Beach, FL 32118

Lift Station 5 Reconstruction
Results
$1,500,000 est. value
New Smyrna Beach, FL

Lift Station 17B Rehabilitation
New Construction
Results
Holly Hill, FL 32117

Reuse Reservoir Expansion and Pump Station Replacement
Renovation
Results
$1,670,000 est. value
New Smyrna Beach, FL 32168

Lift Station 3 Rehabilitation
Renovation
Results
$300,000 est. value
Edgewater, FL

Last Updated 02/22/2022 11:16 AM
Project Title

Westside Water Reclamation In-Plant Pump Station and Headworks - Design-Build

Physical Address View project details and contacts
City, State (County) Daytona Beach, FL   (Volusia County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Design Development
Bids Due View project details and contacts
Estimated Value $18,000,000 to $20,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Influent flow to the Westside WRF is pumped through a series of force mains that are fed by multiple lift stations. The force mains combine into a single 36-inch diameter force main on the Westside WRF property and ultimately discharge into the elevated pretreatment structure. The pretreatment structure is approximately 35-feet above grade, adding nearly 15 psi of pressure to the system. It is the City’s desire to reduce static pressures at lift stations, thereby reducing strain on the force mains. The Pretreatment structure includes screening via bar screens and cyclonic (free) vortex grit removal. During the Wastewater Master Plan, both screening and grit removal scored low with regards to mechanical operation, electrical/SCADA condition, and maintenance intensity. Additionally, both processes were identified to be hydraulically limited to flows less than the permitted capacity. It is the City’s desire to improve these processes to aid in the overall efficiency of the treatment process.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents