Similar Projects
Roofing Replacement for the Reading Public Library Northwest Branch Project
Renovation
Sub-Bidding
$100,000 CJ est. value
Reading, PA 19601

University Park (UP) - Annual Roof Replacement Program
Renovation
Sub-Bidding
$80,000 CJ est. value
State College, PA 16802

Districtwide Miscellaneous Roof Repair
Alteration
Post-Bid
Levittown, PA 19054

Airfield Vault Roof Replacement - General
Alteration
Post-Bid
PA

SCI Pine Grove - Re-Roofing Multiple Buildings
Results
Less than $3,500,000 est. value
Indiana, PA 15701

Hunt Armory Roof Stabilization
Results
Pittsburgh, PA 15206

FTF/Pump House 1 and 2 Roof Replacement Project - General
Alteration
Post-Bid
PA

Roof Replacements at North East Elementary Center
Alteration
Results
North East, PA 16428

Roof Replacement for the Punxsutawney Area Elementary School
Alteration
Post-Bid
Punxsutawney, PA 15767

Roof Replacements at Corry Middle High School
Alteration
Results
Corry, PA 16407

Roof Replacement
Alteration
Post-Bid
Harborcreek, PA 16421

Fire Station Roof Repair
Alteration
Results
$40,000 est. value
Mechanicsburg, PA 17055

Municipal Building Roof Replacement
Alteration
Post-Bid
$175,000 est. value
Carlisle, PA 17013

DLCC Design Build Roof Cable System Repairs
Alteration
Results
Pittsburgh, PA 15222

Replacement of the Existing Roofs
Alteration
Post-Bid
Waynesburg, PA

Last Updated 07/19/2023 03:21 PM
Project Title

Founder's Hall - Roof Replacement

Physical Address View project details and contacts
City, State (County) McKeesport, PA 15132   (Allegheny County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids
Project Status Results, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $846,900 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Founder's Hall Middle School Roof Replacement Roof replacement Furnishing of all necessary and required labor, materials, tools, equipment, scheduling, transportation, supervision, and the complete performance of all work School District anticipates awarding Contract within sixty (60) days of the bid opening. No bona fide bids shall be altered or withdrawn for a period of sixty (60) days after the bid opening The successful bidder must furnish the school district Performance Bond and a separate Payment Bond each in the amount of 100 percent of the bid. Successful bidders will utilize form AIA A312 to complete the Performance and Payment Bond. This project is subject to the Commonwealth of Pennsylvania, Department of Labor, and Industrys Prevailing Wage Determination. All bids shall be clearly marked with the contractors name. Whenever a contractor shall submit a bid for the performance of work and the contractor later claims a mistake, error, or omission in preparing said bid, the contractor shall, before the bids are open, make known the fact and in such case the bid shall be returned unopened, and the contractor shall lose the right to bid All questions must be written and address to the Architect above. All written questions must be received five (5) days before the bid due date. Bidders must directly reach out to the Architect and obtain a copy of the bid form. The Owner reserves the right to reject any or all bids, and/or to waive any informality, infirmity, omission, defect, irregularity and/or disqualifying error in any bid This Project consists of repairs to the envelope and partial roof replacement to the existing Middle School

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents