Similar Projects
Jeffersonville CSO Storage Interceptor Phase 3
Post-Bid
Jeffersonville, IN

Sewer Construction Material
Term Contract
Post-Bid
Fort Wayne, IN

Madison Street and 65th Lane Sanitary Sewer Improvement
Results
Merrillville, IN 46410

LTCP Phase 5 - South Region CSO Abatement
Results
Noblesville, IN 46060

Cass Street Bottleneck Removal
Post-Bid
Peru, IN

Montgomery Avenue and Storm Line
Results
$1,000,000 est. value
Clarksville, IN 47129

Underground Facility Locating Services
Term Contract
Post-Bid
Anderson, IN 46011

Sanitary Sewer Extension at the Shelbyville AASF/Readiness Center
Results
Shelbyville, IN 46176

Riley Pump Station Elimination
Post-Bid
Bedford, IN

I-69 / SR 64 South East Quadrant Sanitary Sewer - Phase 1
Results
$470,000 to $530,000 est. value
Princeton, IN 47670

CSO 1 Elimination
Post-Bid
Kokomo, IN 46901

2020 Sanitary Sewer Extensions-Contract B
Results
Decatur, IN 46733

Truesdell Lift Station and Sewer Extension
Post-Bid
La Porte, IN 46350

2020 Sanitary Sewer Extensions-Contract C
Results
Decatur, IN 46733

Brownsburg Sanitary Sewer Improvements
Post-Bid
Brownsburg, IN

Reported 01/19/2022 10:48 AM
Project Title

U1167 Franklin Street Sewer Rehabilitation Part 2

Physical Address View project details and contacts
City, State (County) Evansville, IN 47725   (Vanderburgh County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status All Bids Rejected
Bids Due View project details and contacts
Estimated Value $792,200
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Manned-entry rehabilitation of approximately 1,266 linear feet of 72- inch reinforced concrete pipe. The manned-entry rehabilitation work will include both urethane and epoxy grout injection through the pipe wall into the surrounding pipe bedding, as well as troweled on epoxy mastic for sealing pipe joints within the pipe. Additionally, the work includes stabilization of soils above the rehabilitated pipe and beneath existing roadways through the use of polyurethane grouting. The work will also require bypass pumping of combined sewer flows on an as needed basis, as well as traffic control.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents