Similar Projects
I-90/Hamilton St EB Off-Ramp - Bridge Deck Repair
Infrastructure, Renovation
Conception
$2,701,000 CJ est. value
Moses Lake, WA 98837

I-90/Hamilton St EB Off-Ramp - Bridge Deck Repair
Infrastructure, Renovation
Conception
$2,701,000 CJ est. value
Moses Lake, WA 98837

Priest Rapids Recreation Area Dredging and Bank Stabilization
Infrastructure
Design
$425,000 CJ est. value
Mattawa, WA 99349

I-90/SR 261 EB and WB Bridges - Structure Rehabilitation
Infrastructure, Renovation
Design
$5,169,000 CJ est. value
Moses Lake, WA 98837

RFQ - Sources Sought for Weed Control Throughout Central Oregon
Term Contract
Bidding
Grand Coulee, WA 99133

Dodson Road Overlay
Infrastructure
Post-Bid
Ephrata, WA

SR 17 ET AL, NCR Seal 2022
Infrastructure
Post-Bid
$4,000,000 to $5,000,000 est. value

U-SE Road Overlay
Infrastructure
Results
$1,903,263 est. value
Ephrata, WA

Miscellaneous COF Upgrades
Infrastructure
Results
$470,000 est. value
Moses Lake, WA

8th Street and Selkirk Avenue Improvements
Infrastructure
Construction
$410,145 CJ est. value
Mattawa, WA 99349

8th Street and Selkirk Avenue Improvements
Infrastructure
Construction
$410,145 CJ est. value
Mattawa, WA 99349

Samaritan Hospital
New Construction, Infrastructure
Pending Verification
$136,000,000 CJ est. value
Moses Lake, WA 98837

Banks Lake Pumped Storage - Columbia Basin Hydropower
Infrastructure
Conception
$1,400,000,000 CJ est. value
Beverly, WA 99321

I-90/Wilson Creek Bridge WB - Deck Rehabilitation
Infrastructure, Renovation
Design
$946,000 CJ est. value
Moses Lake, WA 98837

Airfield Pavement Maintenance
Term Contract
Post-Bid
Hoquiam, Quincy, WA 98550

Last Updated 01/31/2023 04:03 AM
Project Title

SR 24/I-82 to Riverside Rd - ADA Compliance

Physical Address View project details and contacts
City, State (County) Mattawa, WA 99349   (Grant County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected December 2023
Bids Due View project details and contacts
Estimated Value $321,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Pedestrian ADA curb ramps at various intersections on SR 24 east of I-82 do not fully meet ADA standards. Upgrade the curb ramps to meet current standards, improving accessibility for all pedestrians. As of January 31, 2023, this project is in Design status. Preliminary engineering has begun and environmental design is expected to be complete in the Third quarter of 2023. The contract advertisement is expected in Fourth quarter of 2023 and construction is anticipated to be operationally complete in the Fourth quarter of 2024. WSDOT - SR 24/I-82 to Riverside Rd - ADA Compliance *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents