Similar Projects
Last Updated | 05/08/2020 01:46 PM |
Project Title | Marine Science Center ADA Enhancements |
Physical Address | View project details and contacts |
City, State (County) | Ponce Inlet, FL 32127 (Volusia County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Sidewalks/Parking Lot |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $65,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | 1. The main project is the reconstruction of an existing timber walkway to the Seabird Sanctuary. In order to obtain ADA compliance the existing walkway will need to be lengthened by adding additional switchbacks . Depending on design some units of the existing substructure footprint maybe reused if possible. The walkway shall be designed to minimize impact to the existing vegetation as much as practicable. The contractor shall include adding an ADA compliant parking space to the existing parking lot in the site plan and construction documents. 2. Secondary project is the minor modification of an existing stairway handrail on the SE corner of the Main building to the Sea turtle lab area. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |