Similar Projects
Hoots Wings
Build-Out - 2,400 SF
Conception
Tyler, TX

CEFCO
New Construction - 6,000 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Tyler, TX

A-Affordable Storage / Bullard
New Construction, Infrastructure - 200,000 SF
Design
$3,000,000 CJ est. value
Bullard, TX 75757

2021 Creek Crossing Reroutes and Repairs
Infrastructure
Bidding
$1,200,000 CJ est. value
Tyler, TX 75702

Road Improvements to CR 366 and CR 369
Infrastructure
Post-Bid
$1,600,000 est. value
Tyler, TX 75702

Road Improvements to CR 422
Infrastructure
Post-Bid
$1,130,000 est. value
Tyler, TX 75702

Surfacing/Roadway Restoration
Results
$19,771,674 est. value
TX

Widen Road - Add Shoulders
Results
$1,394,049 est. value
TX

7-Eleven
Renovation - 3,000 SF
Construction
Tyler, TX 75702

7-Eleven
New Construction - 4,000 SF
Construction
$1,200,000 est. value
Tyler, TX 75703

Baroness Salon and Suites/ Tyler
New Construction, Infrastructure - 14,741 SF
Pending Verification
$3,000,000 CJ est. value
Tyler, TX 75703

McDonald's 33526 / Tyler
Renovation - 1,969 SF
Pending Verification
$305,000 est. value
Tyler, TX 75706

Hospitality Health ER Expansion
New Construction, Infrastructure - 26,000 SF
Design
$2,500,000 CJ est. value
Tyler, TX 75701

New Sanctuary - Mt. Sylvan Baptist Church
New Construction, Infrastructure
Post-Bid
$5,000,000 CJ est. value
Tyler, TX 75702

IH-20 Total Maintenance
Results
$5,044,222 est. value
TX

Last Updated 08/24/2022 11:33 AM
Project Title

DK Convenience Store

Physical Address View project details and contacts
City, State (County) Tyler, TX 75702   (Smith County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Food/Beverage Service, Gas Station, Paving/Reconstruction, Site Development, Vehicle Sales/Service
Contracting Method Bids by Invitation
Project Status Obtained from a credible source, Awaiting verification, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of August 24, 2022, the editorial content management team is working to obtain a firm construction timeline and information on the general contractor. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

4,100 SF.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Concrete Finishing.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Panel Doors, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Resilient Flooring, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Vehicle Service Equipment, Vehicle-Washing Equipment, Refrigerated Display Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Countertops, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Screening Devices, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 44 - Pollution and Waste Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents