Similar Projects
New Water Treatment System
Term Contract, Alteration
Design
$25,000 to $100,000 est. value
Waldport, OR

Water Filtration System
Renovation
Bidding
$600,000 CJ est. value
Woodburn, OR 97071

Water Storage Tank Improvement
Infrastructure
Bidding
$14,570,233 CJ est. value
Waldport, OR 97394

Cascade Well No. 10 Drywell Installation
Infrastructure
Sub-Bidding
$129,880 CJ est. value
Gresham, OR 97030

750,000 Gallon Reservoir #2
New Construction, Infrastructure
Sub-Bidding
$1,200,000 CJ est. value
Sublimity, OR 97385

FMS - Facilities Support: Maintenance and Repair BPA
Term Contract
Post-Bid
$2,500 to $300,000 est. value
Roseburg, OR 97471

CB2 at Brewery Blocks 2 Building
Alteration
Post-Bid
Portland, OR

Diamond Lake Rescue Building
New Construction, Alteration
Results
Roseburg, OR

Commercial Plumbing Service
Alteration
Results
OR

Horn Creek Channel Improvements
Infrastructure
Bidding
$150,000 CJ est. value
Central Point, OR 97502

On-Call Trade Services for Prevailing Wage Projects
Term Contract
Post-Bid
OR

Tri-City Water Resource Recovery Facility ("WRRF") Fill Removal
Infrastructure
Results
$662,500 CJ est. value
Oregon City, OR 97045

Eugene Street Water and Wastewater Replacement Project
Infrastructure
Bidding
$1,460,000 CJ est. value
Hood River, OR 97031

On-Call Repair and Maintenance Services Retainer Contract
Alteration
Post-Bid
Eugene, OR

Philomath Water Treatment Plant Improvements, Phase I
Infrastructure
Results
$4,161,000 CJ est. value
Philomath, OR 97370

Last Updated 05/09/2023 07:31 AM
Project Title

Water Filtration Plant Clearwell Baffling System

Physical Address View project details and contacts
City, State (County) Pendleton, OR 97801   (Umatilla County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Results, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $358,330 [brand] Estimate
Plans Available from Civil Engineer - 05/01/23
Owner View project details and contacts
Architect View project details and contacts
Description

ll bidders must be prequalified and all prequalifications must be submitted to the City by 1:00 pm the day before the bid opening. For additional information regarding the project , contact Tim Smith, Control Systems Manager, at tim.smith@ci.pendleton.or.us or (541) 379-1195. Baffle curtain to be installed within an existing 1.8 million gallon Clearwell located at the Water Filtration Plant, 1001 Goad Road, Pendleton, Oregon. Work must be performed on-site and completed within a three-week window between October 2, 2023, to November 17, 2023. To complete this work, City will have the Water Filtration Plant off-line and rely on its well supply to meet customer needs. There is no flexibility to perform work outside this seven-week construction window. 1. Supply all equipment and materials for a baffling system. (see attached drawings) 2. Install all floor, wall, and roof brackets per manufacturer's engineered drawings. 3. Repaint with NSF approved paint system all brackets and welded areas where paint was removed. 4. Repaint outside of tank where discolored from welding and where metal is visible. 5. Install all baffle curtains using cabling system for support. 6. Clean and disinfect entire inside of Clearwell. 7. Perform additional and incidental work as called for in the Technical Specifications and Drawings.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents