Similar Projects
RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

RFP - Continuing Services Traffic Operations Design Consultant
Term Contract
Conception
$5,000,000 CJ est. value
Santa Rosa Beach, FL 32459

Fairbanks Ferry Road Re-Bid
Infrastructure
Bidding
$1,700,000 CJ est. value
Havana, FL 32333

Fairbanks Ferry Road Re-Bid
Infrastructure
Bidding
$1,700,000 CJ est. value
Havana, FL 32333

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

County Road 161 (Point Milligan Road) SCOP
Infrastructure
Post-Bid
$2,600,000 est. value
Quincy, FL 32352

Cochran Road (SCRAP)
Results
FL

Cochran Road SCRAP and Fairbanks Ferry Road SCOP Paving Projects
Results
Quincy, FL 32324

RFP - D/W Traffic Safety Studies and Minor Design
Term Contract
Conception
$1,500,000 CJ est. value
Vernon, FL 32462

Safety Project/Pavement Widening/Embankment/Drainage Improvements
Infrastructure
Bidding
$1,670,795 CJ est. value
Marianna, FL 32448

Asphalt Maintenance-Districtwide Maintenance
Infrastructure
Post-Bid
$500,000 est. value

Strategic Resource Evaluation Study - Highway Construction Materials
Infrastructure
Results

Stewart Street II SCOP
Infrastructure
Post-Bid
$1,000,000 est. value
Quincy, FL 32351

Potter Woodberry Road CIGP
Infrastructure
Results
$814,695 est. value
Havana, FL 32333

2022 Striping Project
Alteration
Post-Bid
$80,000 est. value
Quincy, FL

Last Updated 08/22/2022 03:03 PM
Project Title

RFP Engineering - Design SR 65 from SR 20 to Gadsden County Line in Liberty County

Physical Address View project details and contacts
City, State (County) Quincy, FL 32351   (Gadsden County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected June 2024
Bids Due View project details and contacts
Estimated Value $4,856,346 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

As of May 26, 2022, information regarding award and award date has not been disclosed. Although a firm timeline for construction has not been determined, construction is not expected to start prior to fiscal year 2024. *The closed solicitation has been included below for reference: Project Threshold : Project is greater than or equal to $500,000.00 (Technically Prequalified & Unlimited Audit required) District : 03 Selection Method : Letter of Response and Abbreviated Technical Proposal Project Description : Design SR 65 from SR 20 to Gadsden Co. Line in Liberty Co. TRC Members (Subject to Change) : Craig Gavin Ray Kirkland Zeke Hayes This project has been reserved for competition among only small businesses in accordance with the Department's Business Development Initiative (BDI) Program. Letter submittals for this project will only be accepted from firms that meet the definition of a small business set forth by section 337.027, Florida Statutes. The prime consultant submitting a Letter must be a qualified professional services firm and meet the small business definition of section 337.027, Florida Statutes at the time of submittal of the Letter and must maintain this status as a small business through contract execution. All subconsultants utilized for the project, including lower-tier and non-professional services firms, must also be a small business pursuant to section 337.027, Florida Statutes at the time of submittal of the Letter and must also maintain this status as a small business through contract execution. Contract execution is contingent upon firms maintaining small business status through contract execution. Design SR 65 from SR 20 to Gadsden County Line in Liberty County Response Deadline is 4:00 PM Central Time on the date indicated in the schedule below. Shortlist Meeting is 9:00 AM Central Time on the date indicated in the schedule below. Final Selection Meeting is 9:00 AM Central Time on the date indicated in the schedule below. Times shown in the schedule section below are converted and displayed based upon YOUR COMPUTER TIME Financial Management Number(s) 44573513201 Shortlist Selection Date/Time 12/06/2021 08:30 pm Phase II Submittal Deadline Date/Time 12/28/2021 11:30 pm Final Selection Date/Time 1/17/2022 08:30 pm Negotiations Period Begin Date 1/18/2022 Negotiations Period Ending Date 3/08/2022 The method of contractor selection has not been determined at this time. FDOT - RFP Engineering - Design SR 65 from SR 20 to Gadsden County Line in Liberty County

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents