Similar Projects
Osage Hills Addition Phase 2
New Construction
Conception
Maumelle, AR

Single Family Subdivision Phase XXV
New Construction
Conception
North Little Rock, AR

Devoe Bend Single Family Home Subdivision
New Construction
Design
Maumelle, AR

Carter Lane Estates
New Construction
Design
Little Rock, AR 72223

I-40 - Military Dr. (S)
Infrastructure
Bidding
$2,107,438 CJ est. value
North Little Rock, AR 72114

2" Galvanized Water Main Replacements Little Rock Ph. 1 - 2023
Infrastructure
Bidding
$1,170,000 CJ est. value
Little Rock, AR 72202

Sherwood Public Works Site Development Phase 2
Infrastructure
Post-Bid
Sherwood, AR

Little Rock Afb Civil Works
Term Contract
Post-Bid
$79,000,000 est. value
Jacksonville, AR 72078

LIT Vortac Relocation Access Drive and Site Grading (Harris Road)
Infrastructure
Results
Little Rock, AR 72223

Demolition and Site Clearance of 8 Locations
Demolition, Infrastructure
Results
North Little Rock, AR 72114

Pinnacle Heights
New Construction
Construction
Maumelle, AR

Taxiway Charlie Reconstruction Program - Phase 2
Infrastructure
Construction
$70,754,110 CJ est. value
Little Rock, AR 72202

Country Club Of Arkansas
New Construction
Pending Verification
Maumelle, AR

Quapaw Subdivision - Master Plan
New Construction
Pending Verification
North Little Rock, AR

2022 Capital Improvements Bond Projects - City of Little Rock
New Construction, Infrastructure
Conception
$161,800,000 CJ est. value
Little Rock, AR 72201

Last Updated 10/27/2022 11:05 AM
Project Title

Watershed Pointe / Divide Highway

Physical Address View project details and contacts
City, State (County) Little Rock, AR 72212   (Pulaski County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Single-Family Homes, Site Development
Contracting Method Bids by Invitation
Project Status Conceptual Design, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $11,700,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of October 27, 2022, this project is in conceptual design with schematic drawings. An Architect has not been selected. A general contractor has not been disclosed. Although a firm timeline is not available, the construction is not likely to start until October 2023.

Details

Acre, 23 Acre.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents