Similar Projects
Cooling Tower Cleaning and Disinfection
Alteration
Bidding
Detroit, MI

2022 HVAC Improvement Projects
Alteration
Bidding
$900,000 est. value
Le Roy, MI

East Lansing Public Library HVAC Upgrade and Site Improvements
Post-Bid
East Lansing, MI 48823

USCG Replace Furnaces at CG Airsta Detroit, Mt. Clemens, MI
Post-Bid
Mount Clemens, MI

Township Hall Boiler Replacement
Results
Dewitt, MI

2020 Bond Projects - Series 1 Release 2A District Wide Upgrades
Results
Vicksburg, MI 49097

Gratiot County Courthouse HVAC Unit 3
Alteration
Bidding
$70,000 est. value
Ithaca, MI 48847

2021 Elementary School Air Conditioning and Lighting
Post-Bid
Ann Arbor, MI 48104

Ionization Unit
Results
Rudyard, MI 49780

Hannah and Ottawa Buildings - Replace HVAC System
Alteration
Bidding
$3,500,000 est. value
Lansing, MI 48933

Kettering High School Classroom AC and Mott High School Chiller Replacement
Post-Bid
Waterford Township, MI 48329

Upgrade Ventilation
Results
Grand Rapids, MI 49504

City of Fraser Municipal Complex - RTU Replacement
Alteration
Bidding
$70,000 est. value
Fraser, MI 48026

2021 Air Conditioning and Lighting Upgrades- BP 2
Post-Bid
Ann Arbor, MI 48108

Box Air Filters
Results
Harrison, MI 48625

Reported 05/13/2022 12:00 AM
Project Title

Veterans Hall HVAC

Physical Address View project details and contacts
City, State (County) Saginaw, MI 48604   (Saginaw County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The HVAC project consists of demolition of existing HVAC system, plugging of existing underground ductwork, and installation of (2) new roof top units and associated ductwork. Included as part of this project is demolition of exterior lean-two structure, construction of new concrete housekeeping pads, structural reinforcements, minor reconstruction, and new lay-in ceiling system.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents