Similar Projects
Chlorination Updates - Hancock Well and Oak Street Well Projects
Bidding
Midvale, Sandy, UT 84094

Purchase and Deliver Well Surface and Intermediate Casing Forge
Term Contract
Post-Bid
Salt Lake City, UT 84112

Water Treatment- Green Well
Post-Bid
Riverton, UT

Well No. 8 Chlorinator Replacement
Results
Salt Lake City, UT 84119

Refurbishment and Upgrade of Well #4
Results
Less than $100,000 est. value
West Jordan, UT

Drilling Rig and Services for Paradox Basin
Post-Bid
Salt Lake City, UT

Murray Park Well
Results
Less than $1,257,651 est. value
Murray, UT 84107

Walker Lane Well Rehabilitation
Post-Bid
Less than $2,000,000 est. value
Holladay, UT 84117

Kenilworth RR 1-A Well Plug
Results
$50,000 to $60,000 est. value
Salt Lake City, UT 84114

Well Plugging
Post-Bid
Salt Lake City, UT

Flat Iron Mesa Well House Construction Project
Results
Sandy, UT 84070

Well in Paradox Basin
Term Contract
Results
Salt Lake City, UT 84112

Pump-House Parts and Repairs
Term Contract
Results
Salt Lake City, UT 84190

Decker Main WWPS Pump Replacement - Phase 2
Results
Less than $450,000 est. value
West Valley City, UT 84119

Well Site Housing Units
Results
Salt Lake City, UT 84112

Last Updated 08/18/2020 03:21 PM
Project Title

Horizontal Well Riverfront Park

Physical Address View project details and contacts
City, State (County) South Jordan, UT 84095   (Salt Lake County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of a horizontal well, pump house, and secondary irrigation system Work include, but not limited to, the drilling of a horizontal well including furnishing and installation of all material s and equipment; furnishing and installation of all pipe, pumps, valves, and all appurtenances needed to operate the pump house; furnishing and installation of pipe and connection materials for the irrigation system; and miscellaneous appurtenances. The project also includes, traffic control, permits, site preparation, surveying staking; material testing and quality control; demolition, removal and disposal of waste material; furnishing and installation of electrical conduits, electrical panels, and appurtenances needed to provide power to the pump house; furnishing and installation of all materials; all labor; supplies; tools, equipment, parts, rentals, fuels, and utilities; subcontractors and suppliers; mobilization and all other costs

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents