Similar Projects
North Airfield Lighting Control Vault Upgrades - 41443 - City of Chicago
Infrastructure
Conception
$4,249,630 CJ est. value
Chicago, IL 60666

Replace 16" Water Main leaving Water Plant to Westwood Drive - Village of Park Forest
Infrastructure
Conception
$750,000 CJ est. value
Park Forest, IL 60466

Residences of Fox Meadows
New Construction, Infrastructure
Design
$205,000,000 CJ est. value
Nunda Township, IL 60050

2022 Harvey Avenue Improvements
Infrastructure
Design
$400,000 CJ est. value
Western Springs, IL 60558

Parkland College - 2022 Reconstruct North Courtyard
Demolition, New Construction, Infrastructure
Bidding
$2,400,000 CJ est. value
Champaign, IL 61822

Calumet 18E Relief Connecting Structure and Sewer Work, CSA
Infrastructure
Bidding
$2,863,800 CJ est. value
Chicago, IL 60604

PIP-II Site Work
Post-Bid
Batavia, IL

Hvac And Structural Weatherization
Term Contract
Post-Bid
Effingham, Mount Carmel, IL 62401

Site Improvements at Breiter-Palm Park
Infrastructure
Results
Bensenville, IL 60106

Briar Lane Elevated Water Storage Tank Maintenance and Repainting
Infrastructure
Results
Less than $564,800 est. value
Oak Forest, IL

210 N Aberdeen Mixed-Use
New Construction, Infrastructure - 10,700 SF
Construction
$140,000,000 CJ est. value
Chicago, IL 60607

Tri-State Tollway (I-294) Roadway and Bridge Reconstruction
Infrastructure
Construction
$205,907,075 CJ est. value
Hinsdale, IL 60521

Grace Manor Apartments / Ogden Ave Mixed Use Development
New Construction, Infrastructure - 25,466 SF
Pending Verification
$25,000,000 CJ est. value
Chicago, IL 60623

Dispensary33 Expansion
Renovation, Infrastructure
Pending Verification
$500,000 CJ est. value
Chicago, IL 60640

Pennslyvania Avenue West Of Orchard Street Resurfacing To Race - City of Urbana
Infrastructure
Conception
$617,150 CJ est. value
Urbana, IL 61801

Last Updated 10/04/2022 09:34 AM
Project Title

Construction of a New Elevated Water Storage Tank, Replacement of a Master Meter Pit Lid, Demolition of an Existing Water Tower

Physical Address View project details and contacts
City, State (County) Henderson, IL 61439   (Knox County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Storage/Water Tanks
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $540,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Village of Henderson Owner P.O. Box 199 Address Henderson, IL 61439 Separate sealed BIDS for the construction of (briefly describe nature, scope, and major elements of the work): Construction of a new 50,00-gallon elevated water storage tank, related piping tie-ins, and controls located at 205 North State St, and the replacement of a master meter pit lid at the existing meter vault along Knox Rd 2000 N. Demolition of an existing 20,000-gallon water tower, existing site fence. Any contract or contracts awarded under this invitation for bids are expected to be funded in part by a loan from the Illinois Environmental Protection Agency (Illinois EPA). Neither the State of Illinois nor any of its departments, agencies, or employees is or will be a party to this invitation for bids or any resulting contract. The procurement will be subject to regulations contained in the Procedures for Issuing Loans from the Public Water Supply Loan Program (35IAC Part 662), the DavisBacon Act (40 USC 276a through 276a-5) as defined by the United States Department of Labor, the Employment of Illinois Workers on Public Works Act (30 ILCS 570), Illinois Works Jobs Program Act (30 ILCS 559/20-1), and the federal "Build America, Buy America Act" requirements contained in the Infrastructure Investment and Jobs Act, Pub. L. No. 117-58. This procurement is also subject to the loan recipient's policy regarding the increased use of disadvantaged business enterprises. The loan recipient's policy requires all bidders to undertake specified affirmative efforts at least sixteen (16) days prior to bid opening. The policy is contained in the specifications. Bidders are also required to comply with the President's Executive Order No. 11246, as amended. The requirements for bidders and contractors under this order are explained in 41 CFR 60-4." The CONTRACT DOCUMENTS may be examined at the following locations: Klingner & Associates, Plan Room.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents