Project Title | Construction of a New Elevated Water Storage Tank, Replacement of a Master Meter Pit Lid, Demolition of an Existing Water Tower |
Physical Address | View project details and contacts |
City, State (County) | Henderson, IL 61439 (Knox County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Site Development, Storage/Water Tanks |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected November 2022 |
Bids Due | View project details and contacts |
Estimated Value | $540,000 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Village of Henderson Owner P.O. Box 199 Address Henderson, IL 61439 Separate sealed BIDS for the construction of (briefly describe nature, scope, and major elements of the work): Construction of a new 50,00-gallon elevated water storage tank, related piping tie-ins, and controls located at 205 North State St, and the replacement of a master meter pit lid at the existing meter vault along Knox Rd 2000 N. Demolition of an existing 20,000-gallon water tower, existing site fence. Any contract or contracts awarded under this invitation for bids are expected to be funded in part by a loan from the Illinois Environmental Protection Agency (Illinois EPA). Neither the State of Illinois nor any of its departments, agencies, or employees is or will be a party to this invitation for bids or any resulting contract. The procurement will be subject to regulations contained in the Procedures for Issuing Loans from the Public Water Supply Loan Program (35IAC Part 662), the DavisBacon Act (40 USC 276a through 276a-5) as defined by the United States Department of Labor, the Employment of Illinois Workers on Public Works Act (30 ILCS 570), Illinois Works Jobs Program Act (30 ILCS 559/20-1), and the federal "Build America, Buy America Act" requirements contained in the Infrastructure Investment and Jobs Act, Pub. L. No. 117-58. This procurement is also subject to the loan recipient's policy regarding the increased use of disadvantaged business enterprises. The loan recipient's policy requires all bidders to undertake specified affirmative efforts at least sixteen (16) days prior to bid opening. The policy is contained in the specifications. Bidders are also required to comply with the President's Executive Order No. 11246, as amended. The requirements for bidders and contractors under this order are explained in 41 CFR 60-4." The CONTRACT DOCUMENTS may be examined at the following locations: Klingner & Associates, Plan Room. |
||||||||||||||
Details |
|
||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |