Similar Projects
Mainstreet and Twenty Mile Road Intersection Improvements
Infrastructure
Bidding
CO 80138

Plum Creek Parkway Widening Phase 2
Infrastructure
Bidding
Castle Rock, CO 80108

Adaptive Traffic Signal Sys
Post-Bid
Castle Rock, CO 80104

Desert Ridge Place Storm Sewer Reconstruction
Post-Bid
Castle Rock, CO

Jamaica Street and Meridian Boulevard Intersection Improvements
Results
Less than $3,581,615 est. value
Castle Rock, CO 80104

Peoria Street Widening Project
Results
Less than $1,058,887 est. value
Castle Rock, CO

Civil Site Work IDIQ for Interior Region 8
Post-Bid
$25,000 to $500,000 est. value
Glendale, Yuma, AZ

2020 Road Repair Project
Results
Castle Rock, CO 80108

2021 Community Roadwork
Infrastructure
Post-Bid
Highlands Ranch, CO 80126

Canyons Filing 1 3rd Amendment Storm Roadways Water and Sanitary
Results
Lone Tree, CO

2021 Woodmoor Mountain Road Project
Infrastructure
Post-Bid
CO

2021 Townwide Resurfacing Program
Results
Parker, CO

2021 Miscellaneous Concrete Replacement Project
Infrastructure
Post-Bid
Castle Rock, CO

Centerra Parcel 301 Public Infrastructure
Results
$1,000,000 to $1,500,000 est. value

Castle Rock & CDOT Region 1 ATSPM Upgrades, ATSPM Dashboard Dev. & Corridor Sign
Term Contract, Infrastructure
Post-Bid
Castle Rock, CO

Last Updated 03/24/2022 03:43 PM
Project Title

Havana Street and Meridian Boulevard Intersection Improvement Project

Physical Address View project details and contacts
City, State (County) CO   (Douglas County)
Category(s) Heavy and Highway, Outdoor Lighting, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Roadway Lighting, Storm/Sewers, Traffic Signalization
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $5,451,745
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of The Havana Street and Meridian Boulevard Intersection reconfiguration and traffic signal replacement. This project includes the installation of fiber optic cable to interconnect Douglas County traffic signals throughout the Meridian Business Park. The major components of the project are concrete paving, storm sewer construction, curb ramp construction, traffic signal construction, roadway lighting installation, and fiber optic cable installation.The Project includes the following major items and approximate quantities: 10,048 square feet of Concrete Pavement (9 Inch) 17,621 linear feet of Fiber Optic Cable (Single Mode) (Install Only) 2 Complete Traffic Signal Installations

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.
Division 34 - Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals, Traffic Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents