Similar Projects
A & E Multiple Award Task Order Contract (MATOC)
Design
$3,500 to $100,000,000 est. value

Central Region AE IDIQ
New Construction, Term Contract
Design
$25,000,000 est. value

2020 Architect and Engineering IDIQ
Post-Bid
$5,000 to $75,000,000 est. value

Various Phase II Projects
Post-Bid
$300,000 to $3,000,000 est. value

Water Tank Inspections, OCONUS and CONUS
Results
$10,000 to $5,000,000 est. value

USDA Forest Service Eastern Region Architect & Engineer Services IDIQ
Results
$2,500 to $5,000,000 est. value

Infrastructure Investment and Jobs Act - Environmental AE MATOC
Renovation, Term Contract
Design
Less than $45,000,000 est. value

Various Phase III Construction Inspection Projects
Post-Bid

National Architecture/Engineering/Interiors (IDIQ) Contract
Results
Less than $25,000,000 est. value

Various Phase I Studies
Post-Bid
Less than $20,000,000 est. value

Florida Windspeed UFC Update
Results

Various Phase I Traffic Studies Projects
Post-Bid
Less than $800,000 est. value

Various Statewide Engineering for Structure Projects, Major River Bridge Inspections, Bureau of Bridges and Structures
Results
Less than $2,000,000 est. value

Various Phase II Subsurface Utility Engineering Projects
Post-Bid
Less than $4,000,000 est. value

Northampton Lane Water Main Replacement
Results
Lincolnshire, IL

Reported 04/01/2022 12:00 AM
Project Title

Professional Services for Flow Study, Hydraulic Modeling, and Design

Physical Address View project details and contacts
City, State (County) Gurnee, IL   (Lake County)
Category(s) Professional Services
Sub-Category(s) Engineering
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The project will be completed in two phases. The first phase will be focused on assessing the existing and future flows, the capacity of the pump station and downstream sewers, and providing design alternatives for a parallel force main based on the evaluation of the existing infrastructure. The second phase will be focused on design, bidding, and construction related tasks for the selected alternative.

Details

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents