Similar Projects
10th Street SE at Hull Avenue Storm Sewer Improvements
Conception
$1,846,900 est. value
Cedar Rapids, IA 52407

Storm Sewer Improvements
Conception
$2,000,000 est. value
Cedar Rapids, IA

Lower City Park and Kimball Road Storm Sewer Improvement
Infrastructure
Bidding
$250,000 est. value
Iowa City, IA 52242

11th Avenue Storm Sewer
Infrastructure
Bidding
$225,000 est. value
Hiawatha, IA 52233

Clover Lane Overlay
Post-Bid
Asbury, IA

FY 2022 Pavement Patching
Post-Bid
$1,400,000 est. value
Cedar Rapids, IA

West Elm and North Vine Street Improvements
Results
$553,988 est. value
West Union, IA

Marshall Street Reconstruction 2021 Washington Street to Jefferson Street
Results
$510,000 est. value
Prairie City, IA 50228

22nd Street North East and B Avenue Intersection
Conception
$150,000 est. value
Cedar Rapids, IA 52402

Ute Avenue and Ashworth Road Intersection Improvement Project
Infrastructure
Bidding
$5,485,000 est. value
Waukee, IA

2021 Water Pavement Patching Project
Infrastructure
Post-Bid
$132,000 est. value
Iowa City, IA

Ludland Drive Street Repair
Results
$64,079 est. value
Manchester, IA

6th Street South West from 76th Avenue to 2000 South
Conception
$3,170,000 est. value
Cedar Rapids, IA 52404

Riverfront/Downtown Revitalization
Renovation, Infrastructure
Bidding
$17,655,000 est. value
Burlington, IA

Street Repair Retainer
Term Contract, Infrastructure
Post-Bid
West Des Moines, IA

Last Updated 06/24/2021 11:29 AM
Project Title

8th Street Storm Sewer and Street Improvements

Physical Address View project details and contacts
City, State (County) Red Oak, IA   (Montgomery County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $70,300
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The improvements include removal of the existing street (as needed), replacement of the failing storm sewer and storm intakes, replacement of the existing storm structure headwall/wing walls, stabilization of the subgrade, and new concrete pavement.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents