Similar Projects
Salinas Valley Water Project - Phase II
Term Contract
Design
Salinas, Soledad, CA

Range Sustainment and Remediation Environmental Services
Term Contract
Design
Less than $95,000,000 est. value

Arsenic Remediation Project
Infrastructure
Bidding
$775,000 est. value
Vacaville, CA 95688

Range Sustainment and Remediation Environmental Services
Term Contract
Bidding
San Diego, CA

On-Call Environmental Assessment, Remediation, and Compliance Services
Term Contract, Infrastructure
Post-Bid
$15,000,000 est. value
Alhambra, CA 91899

Legacy Slab and Soil Removal
Infrastructure
Post-Bid
Livermore, CA

F--CCAO Putah Creek Underground Storage Tank Remediation
Term Contract
Results
Napa, CA 94558

Pratt Street Mefford Choice Tract Improvements
Term Contract
Results
$7,000,000 est. value
Tulare, CA 93275

Environmental Remediation MAIDIQ (ERMA FY23)
Term Contract
Post-Bid

La Forebay Perchlorate And Voc Cleanup Project - Ex-Situ Groundwater Remediation System Construction
Infrastructure
Results

Military Munitions Response Program (MMRP) at Former Fort Ord SATOC
Term Contract
Post-Bid
Marina, CA 93933

Upper Mormon Slough Erosion Repair
Alteration
Results
$5,387,900 to $6,136,214 est. value
San Joaquin, CA

Habitat Restoration Services
Alteration
Post-Bid
CA

Last Updated 04/11/2022 10:50 AM
Project Title

DVA Alameda Wetlands Mitigation

Physical Address View project details and contacts
City, State (County) Alameda, CA   (Alameda County)
Category(s) Environmental
Sub-Category(s) Wetlands/Remediation
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $5,000,000 to $10,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Wetlands Mitigation for Alameda Point - project consists of constructing a new Wetland area, and enhancing adjacent existing degraded marshland on the Alameda Point Campus site. - Onsite Wetlands Mitigation was a result of unavoidable fill to the existing wetlands in the Alameda Point area. The new wetland area will consist of both a tidal basin and tidal marsh enhancement area. Construction of the tidal basin includes, but is not limited to, excavating to basin floor, grading of channels, and constructing a riprap and aggregate connection through the seawall.

Details

Division 02 - Existing Conditions, Environmental Assessment, Natural Environment Assessment, Water Remediation.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Wetlands.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents