Similar Projects
Regional WWTP and Collection System - General Construction
New Construction
Bidding
East Earl, PA

Hollow Road Pumping Station Grit System Replacement
Renovation
Bidding
$225,000 to $275,000 est. value
Penn Valley, PA

Bunker Hill Water Pump Station
Post-Bid
Central City, PA 15926

Eastwood Pump Station Elimination Project
Post-Bid
North East, PA 16428

Long Term Control Plan Project 2018 Lift Station Improvements - General Construction
Results
Rochester, PA 15074

Knox Avenue Pumping Station Upgrades
Results
$650,000 est. value
Easton, PA 18043

Kohler Tract Pumping Station - General Construction
Construction
$1,300,000 est. value
Emmaus, PA 18049

Flow Diversion - Pump Stations & Force Main Combined
Construction
North Wales, PA 19436

Tindey Run Sanitary Sewer Project - Pump Station General/Mechanical
New Construction
Bidding
Oaks, PA

Beeson Avenue Pump Station
Post-Bid
Marianna, PA 15345

Commercial Iron Shop and In-Field Services at Transfer Stations 1 & 3
Renovation
Results
Chester, PA

Sixth and Canal Pump Station Phase II Upgrade Project - Contract 1 - General Construction
Construction
$6,000,000 to $8,500,000 est. value
Reading, PA 19601

Nicklin Pump Station Rehabilitation
Renovation
Bidding
Franklin, PA

Penn Estates Lift Station
Post-Bid
East Stroudsburg, PA 18301

Tannersville Tanks and Pump Station Project - General Construction
Results
Less than $5,900,000 est. value
East Stroudsburg, PA 18301

Last Updated 09/30/2021 08:39 AM
Project Title

Schell and Koch Roads Sanitary Sewer - General Construction

Physical Address View project details and contacts
City, State (County) Turbotville, PA 17772   (Northumberland County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $97,000 to $146,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project includes the following Work: Installation of gravity and low-pressure sanitary sewer collection system to serve nineteen homes in Lewis Township and installation of a submersible pump station and force main to interconnect the system to the existing Lewis Township sanitary sewer system.

Details

Lift and Pump Stations, New Construction.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents