Similar Projects
Design and Build of Play Fountain
Alteration
Bidding
Mount Clemens, MI 48043

Martin Flushing Improvements
Alteration
Bidding
Clinton Township, MI

Charles Mears State Park - Water Heaters and Installation
Post-Bid
Pentwater, MI

Multiple Buildings Building Number 1080002 - Refrigerant Monitoring Systems Upgrades
Post-Bid
Ann Arbor, MI

Everett High School BP3: Mechanical Improvements
Results
Less than $986,817 est. value
Lansing, MI 48910

Algonac Schools - Algonquin Elementary Boiler
Results
Algonac, MI

Civic Arena Boiler Replacement
Alteration
Bidding
Midland, MI 48640

Mechanical Contractor
Term Contract
Post-Bid

Boiler Replacement at Coolidge,Roosevelt, Riley,Emerson and FHS
Results
Less than $1,895,900 est. value
Livonia, MI

Replacement of Furnace and Water Heater at 242 Hill Street
Alteration
Bidding
Jackson, MI 49202

Mechanical Oxidation Ditch Aerator Replacement
Post-Bid
Brighton, MI

Utilities Services - Replacement of Natural Gas Water Heaters
Results
Port Huron, MI

DMVA Boiler Inspection Services to Include Maintenance
Post-Bid
Lansing, MI

Woodland Elementary Lighting and Boiler Replacement
Results
Auburn Hills, MI

As-Needed Emergency Mechanical and Plumbing Services
Term Contract
Post-Bid
Waterford, MI 48328

Last Updated 08/11/2021 06:41 AM
Project Title

Juvenile Court Boiler Replacement Project

Physical Address View project details and contacts
City, State (County) Mount Clemens, MI 48043   (Macomb County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project entails replacement of existing boilers with two (2) 500 MBH boilers and all associated pumps. Four (4) inline secondary pumps and two (2) inline primary pumps for each boilers. Existing controls shall be adjusted to accommodate new boilers and pumps including new 3-way control valves. New equipment pads will be provided under all equipment as required. Replace all piping, valves and insulation to walls as indicated.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Heating Boilers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents