Similar Projects
Safe Place of the Permian Basin - Phase 1
New Construction
Conception
$22,500,000 est. value
Midland, TX 79703

1111 Fannin Harris County Offices Relocation
Renovation
Conception
$20,000,000 est. value
Houston, TX 77002

Cypress Waters Office Buildings
New Construction - 300,000 SF
Design
$10,000,000 CJ est. value
Dallas, TX

Abilene Group Real Estate Offices
New Construction - 2,932 SF
Design
$400,000 est. value
Abilene, TX 79606

Wellness Center Renovation - District HQ
Renovation
Bidding
$600,000 est. value
Lubbock, TX 79404

BA Renovate #339 into 5-6 Offices
Renovation
Bidding
Commerce, TX 75428

San Antonio Retail Shell Building
New Construction
Sub-Bidding
$1,200,000 est. value
San Antonio, TX 78260

Office Renovations
Renovation
Post-Bid
Summerfield, TX

DFW Inland Ports 1 And 2
New Construction - 505,000 SF
Post-Bid
$10,000,000 CJ est. value
Wilmer, TX

Salvation Army Shelter Conversion
Renovation - 7,500 SF
Results
$855,000 est. value
Freeport, TX 77541

McAllen Public Works Storage Building Addition Unit "F"
Addition
Results
Less than $95,000 est. value
McAllen, TX 78504

Southlake Business Park
New Construction - 182,000 SF
Construction
$10,000,000 CJ est. value
Southlake, TX 76092

North Kealy Avenue Mixed-Use Development
New Construction - 17,600 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Lewisville, TX

1515 Cesar Chavez
New Construction - 71,632 SF
Pending Verification
$5,000,000 to $10,000,000 CJ est. value
Austin, TX 78702

Golden Pond Warehouse
New Construction - 5,000 SF
Pending Verification
$250,000 est. value
Amarillo, TX 79121

Reported 07/20/2022 02:52 PM
Project Title

Haven Storage / The Haven Self Storage

Physical Address View project details and contacts
City, State (County) Gregory, TX 78359   (San Patricio County)
Category(s) Commercial
Sub-Category(s) Office, Warehouse/Storage
Contracting Method Bids by Invitation.
Project Status Construction Documents,
Bids Due View project details and contacts
Estimated Value $4,400,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work and new construction of a mixed-use development in Gregory, Texas. Working plans call for the construction of a 55,450-square-foot warehouse / distribution facility; office development; for site work for a office development; and warehouse / distribution facility. NEW SELF STORAGE BUILDINGS AND OFFICE BUILDING AND SITE WORK As of July 19, 2022, the general contractor is preparing to submit the plans for permitting. A construction timeline is not available.

Details

Office, New Construction, Warehouse/Storage, 55,450 SF New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Carpeting, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents