Similar Projects
Manchester Expressway Mixed-Use Development
New Construction, Infrastructure
Conception
$5,000,000 CJ est. value
Columbus, GA 31904

11th Avenue Triplex
New Construction, Infrastructure
Conception
$600,000 CJ est. value
Columbus, GA 31904

Infantry Road and Follow Me Trail Extension
Infrastructure
Design
$1,000,000 CJ est. value
Columbus, GA 31903

$PRESS - Battalion Operations Facility - Sauer Construction LLC
New Construction, Infrastructure
Design
$63,900,000 CJ est. value
Fort Benning, GA 31905

Automated Speed Detection for School Zone Safety Enforcement
Infrastructure
Bidding
$300,000 CJ est. value
Columbus, GA 31901

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Academic Building and 56 Bed Housing Units - Department of Juvenile Justice
New Construction, Infrastructure - 47,000 SF
Post-Bid
$26,900,000 CJ est. value
Columbus, GA 31820

Water Main Cleaning and Lining Fiscal Year 2022-2026
Infrastructure
Results
Columbus, GA

Distribution System Small Line Replacement Program - Package 1
Infrastructure
Results
$750,000 to $1,500,000 est. value
Columbus, GA

Overburden Storage
New Construction, Infrastructure
Pending Verification
$1,500,000 CJ est. value
Columbus, GA 31808

Marriott Expansion / Columbus
Addition, New Construction, Renovation, Infrastructure
Pending Verification
$20,000,000 CJ est. value
Columbus, GA 31901

AFB International Pet Food Ingredients Facility
New Construction, Infrastructure
Conception
$79,000,000 CJ est. value
Columbus, GA 31901

SR 22 From Fall Line Trace to Talbot County Line
Infrastructure
Design
$8,000,000 CJ est. value
Columbus, GA 31820

Pipe Lining System With Trailer, Mix, Pump and Spray System
Infrastructure
Post-Bid
Columbus, GA

Widening and Reconstruction on Cusseta Rd (CR 62)
Infrastructure
Results
$39,683,951 CJ est. value
Columbus, GA 31903

Last Updated 04/24/2023 07:21 PM
Project Title

Fort Benning Lift Stations 1, 5, and 7 Upgrades

Physical Address View project details and contacts
City, State (County) Columbus, GA 31901   (Muscogee County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $3,227,664 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

1. Lift Station #1: a. Replace the three existing pumps and associated variable frequency drives including the A/C units for each panel b. Remove and replace the pump controls, PLC and HMI c. Modify existing ventilation system d. Install a bypass connection 2. Lift Station #5: a. Replace the 4 existing pumps and associated across the line starters b. Remove and replace the pump controls, PLC and HMI c. Modify existing ventilation system d. Install removable handrails on the top floor and monorail system in the basement e. Rehabilitate the interior surface of the concrete wetwell f. Install a bypass connection 3. Lift Station #7: a. Install a new precast concrete wetwell and valve vault with new submersible pumps, check valves and plug valves. b. Install new electrical conduit to connect the new submersible pumps to the new pump control panels and existing electrical equipment. c. Install new gravity sewer to reroute all existing incoming mains to the new precast concrete wetwell. d. Install a bypass connection The work will be awarded in one Contract.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents