Similar Projects
Lower Frew Levee Setback Design
Infrastructure
Conception
$250,000 CJ est. value
Coles Corner, WA 98826

SR 410/0.75 miles W of East Winter Gate - Culvert Lining
Infrastructure
Conception
$450,000 CJ est. value
Enumclaw, WA 98022

Main Street Place Development
New Construction, Infrastructure - 1,000,000 SF
Design
$380,000,000 CJ est. value
Bellevue, WA 98005

Redmond 87
Demolition, New Construction, Infrastructure - 8,075 SF
Design
$50,000,000 CJ est. value
Redmond, WA 98052

I-405, Brickyard to SR 527 Improvement Project
Infrastructure
Bidding
$525,000,000 CJ est. value
Bellevue, WA 98006

New Transition Services Educational Facility
New Construction, Infrastructure
Post-Bid
$2,500,000 CJ est. value
Bellevue, WA 98004

2nd Avenue Mixed-Use Tower
Demolition, New Construction, Infrastructure
Post-Bid
$45,000,000 CJ est. value
Seattle, WA 98101

Rt 44 Transit Plus Multimodal Corridor
Alteration
Results
Seattle, WA

Lake to Sound Trail - Segment C SeaTac - Rebid
Infrastructure
Results
$6,857,857 CJ est. value
Seatac, WA 98188

Boren Avenue Office Tower
New Construction, Infrastructure - 282,700 SF
Construction
$56,000,000 CJ est. value
Seattle, WA 98101

California Avenue Southwest Apartments
Demolition, New Construction, Infrastructure - 98,536 SF
Construction
$18,000,000 CJ est. value
Seattle, WA 98116

Chapter Buildings
New Construction, Infrastructure - 330,800 SF
Pending Verification
$88,000,000 CJ est. value
Seattle, WA 98105

Olive + Bellevue Mixed Use Development
New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Seattle, WA 98122

Herzman Levee Setback Design
Infrastructure
Design
$500,000 CJ est. value
Coles Corner, WA 98826

Eastrail Trail Connection at Spring Boulevard - City of Bellevue
Infrastructure
Post-Bid
$7,500,000 CJ est. value
Bellevue, WA 98005

Last Updated 04/12/2023 09:38 AM
Project Title

Broad Street Substation Inductor Project Re-Bid

Physical Address View project details and contacts
City, State (County) Seattle, WA 98109   (King County)
Category(s) Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Power Plant, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $6,063,408 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

PROJECT DESCRIPTION: This project consists of the following elements of work: Demolition of existing surface and below grade improvements, shoring and excavation including the removal of contaminated soil, installation of substation screen wall, equipment vaults and foundations, grounding system, oil containment system, firewall system, water deluge system, and interface with other contractors hired by Seattle City Light (major equipment supplier) and all other work needed to complete the project as described within the project documents. A/E ESTIMATE: $4,147,4645 For purposes of the Inclusion Plan, this is considered a Large Concrete type of project with a Past Performance of 21% % WMBE utilization rates based on completed projects. For questions on the Inclusion Plan, please con-tact Miguel Beltran at Miguel.Beltran@seattle.gov or 206-684-4525, Back-up contact is Carmen Kucinski at Carmen.Kucinski@seattle.gov or 206-684-0188. QUESTIONS: Deadline for Contractor questions regarding this Seattle City Light (SCL) project shall be submitted by close of business on Thursday, February 09, 2023, to the Seattle City Light project manager via EMAIL bikas.pande@seattle.gov CLARIFICATION DEADLINE 2/9/2023 5:00 PM For the Inclusion Plan, this is considered a large concrete type of project with a Past Performance of 21 % WMBE utilization rates based on completed projects. Online bid opening - Bid Reading: Emailed PDF Bids and/or mailed hard copy bids will be opened and read aloud via Webex No attendees will be allowed at the Bid opening. Bid email address: fas_pwsecurebid@seattle.gov 2. Webex call-in information is as follows: a. Webex Phone number to connect i. 206-207-1700 (Seattle) or ii. 1-408-418-9388 (United States Toll) b. Meeting Number Access Code: 146 108 8903 Meeting password: COSBidOpening Tap to join from a mobile device (attendees only) +1-206-207-1700,1461088903## United States Toll (Seattle) +1-408-418-9388,1461088903## United States Toll Join by phone +1-206-207-1700 United States Toll (Seattle) +1-408-418-9388 United States Toll Global call-in numbers Join from a video system or application Dial 1461088903@seattle.webex.com

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, High-Performance Structural Concrete, Concrete Finishing, Specialty Placed Concrete, Precast Structural Concrete, Precast Concrete Specialties.
Division 04 - Masonry, Unit Masonry, Concrete Form Masonry Units.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Access Doors and Panels, Coiling Doors and Grilles, Windows, Hardware, Glazing.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 10 - Specialties, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Safety Specialties, Emergency Aid Specialties, Fire Protection Specialties, Exterior Specialties, Security Mirrors and Domes.
Division 11 - Equipment, Parking Control Equipment, Loading Dock Equipment, Security Equipment.
Division 13 - Special Construction, Radiation Protection, Special Instrumentation, Seismic Instrumentation.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Video Surveillance, Electronic Personal Protection Systems, Electronic Detection and Alarm, Fire Detection and Alarm, Radiation Detection and Alarm, Fuel-Oil Detection and Alarm.
Division 31 - Earthwork, Grading, Earthwork Methods, Soil Treatment, Soil Stabilization.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Fuel Distribution Utilities, Electrical Utilities, Electrical Utility Transmission and Distribution, Utility Substations, Utility Transformers, High-Voltage Switchgear and Protection Devices, Medium-Voltage Utility Switchgear and Protection Devices, Communications Utilities.
Division 41 - Material Processing and Handling Equipment, Conveyors, Cranes and Hoists.
Division 46 - Water and Wastewater Equipment.
Division 48 - Electrical Power Generation, Common Work Results for Electrical Power Generation, Instrumentation and Control for Electrical Power Generation, Electrical Power Generation Equipment, Electrical Power Generation Testing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents