Similar Projects
Last Updated | 03/22/2021 06:07 AM |
Project Title | Utilities Force Main East Package 1 |
Physical Address | View project details and contacts |
City, State (County) | FL (Orange County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Sanitary Sewers |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $1,041,526 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Work includes but not limited to the removal and replacement of existing PVC force mains of 6” and 8” diameter situated in Tree Ridge Lane (6”), Waterford Lakes Town Center (8”), Woodbury Road (6”), and Science Drive (6”). The work consists of furnishing all labor, equipment, and materials for the construction of new force mains including connections to the existing force main system, removal of existing force mains, restoration of the areas impacted by the construction work and other associated work as shown on the drawings and specified herein. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |