Similar Projects
BMW Parking Lot Expansion
Alteration
Design
Orland Park, IL 60467

2022 Contractual Asphalt Milling and Resurfacing Repairs
Infrastructure
Bidding
Des Plaines, IL

Roadway Reconstruction on Central Avenue from 47th Street to Burlington Avenue and Storm Sewer Construction with Combined Sewer Separation on Central Avenue and Elm Street
Infrastructure
Bidding
IL

Asphalt Paving & Related Materials & Services - 3 Year Contract
Renovation, Term Contract
Post-Bid
Chicago, IL 60638

2022 Sidewalk and Concrete Maintenance
Post-Bid
Palatine, IL 60067

(1.74-Mile) Improvement
Results
Hillside, Westchester, IL 60162

Crack and Joint Sealing on PCC Pavement
Results
Barrington, Hoffman, Palatine, IL

Valley Lodge Restaurant Addition
Addition, Alteration - 1,250 SF
Pending Verification
Glenview, IL 60025

(2.51-Mile) Standard Overlay, ADA Improvements
Infrastructure
Bidding
IL

HMA Resurfurfacing
Post-Bid
IL

2021 Melinda/Hiawatha Water and Street Improvements
Results
Buffalo Grove, IL 60089

HMA Surface Removal
Infrastructure
Bidding
Willow Springs, IL

Niles West High School 2021 Paving and Sealcoating
Post-Bid
Skokie, IL 60077

ACM Patch and Repair and LBP Mitigation at Falconer Elementary School
Results
Chicago, IL 60641

Peterson ES Parking Lot Repaving
Infrastructure
Bidding
Chicago, IL 60625

Last Updated 04/06/2022 02:27 PM
Project Title

Arlington Heights Road Improvements - Newport Avenue to Brantwood Avenue

Physical Address View project details and contacts
City, State (County) Elk Grove Village, IL   (Cook County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $6,046,418
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Concrete pavement patching, HMA overlay, replacement of curb and gutter, driveway, and sidewalk, retaining wall replacement, street lighting relocation, pedestrian signal modifications, pavement markings, and all incidental and collateral work. 11,584 FT COMBINATION CONCRETE CURB AND GUTTER; 76,329 SQ FT PCC SIDEWALK; 6,500 SY OF CLASS B PATCHING; 2,144 TONS OF POLYMERIZED HMA BINDER COURSE; 3,020 TONS OF HOT-MIX ASPHALT SURFACE COURSE

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents