Similar Projects
Fountain City Service Base Sustainment & Modernization
Design
Fountain City, WI

Port Washington Harbor Breakwater Repairs
Term Contract
Design
$1,000,000 to $5,000,000 est. value
Port Washington, WI

Zoo Path Emergency/Temporary Repair
Infrastructure
Bidding
$30,000 to $60,000 est. value
Racine, WI 53402

Prospect Road Culvert
Post-Bid
Beaver Dam, WI 53916

Culverts
Term Contract
Post-Bid
WI

Operations Truck Ramp, Scale and Drainage Improvements
Results
Beloit, WI

South Fork Pheasant Branch Creek Repairs to Channel
Results
Madison, WI 53562

Concrete Culverts
Post-Bid
WI

2020 La Crosse River Bank Stabilization
Results
Less than $50,000 est. value
La Crosse, WI 54601

Erosion Control Devices
Term Contract
Post-Bid
WI

Steam Pits 14 Replacement - MEP
Results
Less than $320,000 est. value
Stevens Point, WI 54481

Pond and Drainage System Construction
Post-Bid
De Pere, WI

Steam Pits 14 Replacement - General
Results
Less than $320,000 est. value
Stevens Point, WI 54481

2021 Culvert Pipes
Post-Bid
WI

CTH T - CTH G, Calamus Creek Bridge, CTH T - CTH G, Beaver Dam River Bridge
Results
WI

Last Updated 11/12/2021 11:41 PM
Project Title

Stratford - Goodrich, South County Line to STH 64

Physical Address View project details and contacts
City, State (County) Goodrich, Stratford, WI (Marathon, Taylor Counties)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Culvert Pipe, Base, Asphalt Pavement, and Pavement Marking. Base Aggregate Dense, 4,663 Ton; Concrete Masonry End Walls, 4 CY; Marking Epoxy, 39,891 LF; Construction Staking, 28,112 LF; Construction Staking, 3 Each; Construction Staking, 1 LS; Culvert Pipe, 178 LF 30”; Asphaltic Surface, 104 Ton; HMA Pavement, 10,418 Ton; Tack Coat, 1,941 Gals; Riprap, 13 CY.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents