Similar Projects
Waterville Hatchery Intake Pipe Replacement
Infrastructure
Bidding
$302,760 est. value
Waterville, MN 56096

NW Area Watermain Improvements
Infrastructure
Bidding
Faribault, MN

Ground Thawing Services
Term Contract
Post-Bid
Less than $175,000 est. value
Minneapolis, MN

Phase 3A-2 Infrastructure Improvements
Post-Bid
Tracy, MN

20" Forcemain Replacement
Results
Saint Joseph, MN

Meter Station M228A, Interceptor 7015C, and L35 Repair
Renovation, Addition
Results
Brooklyn Park, Maple Grove, MN 55101

Water Transmission System Valve Exercising and Condition Assessment Services
Infrastructure
Bidding
Minneapolis, MN

2021 Watermain Replacement
Post-Bid
$520,000 est. value
East Grand Forks, MN

Ridgedale Drive Watermain Replacement
Results
Minnetonka, MN 55305

77th Street and TH 77 Improvements
Infrastructure
Bidding
Richfield, MN

West Bridge Street Reconstruction
Post-Bid
$3,400,000 est. value
Owatonna, MN

Brookdale Park Neighborhood Reconstruction
Results
Less than $5,900,000 est. value
Brooklyn Park, MN 55444

2021 Downtown Improvement Project/Lions Park
New Construction, Infrastructure
Bidding
Hugo, MN 55038

2021 Water Main
Post-Bid
$875,000 est. value
Blaine, MN

City Street and Utility Improvements and CSAH Street Improvements
Results
$7,500,000 to $8,500,000 est. value
Clearbrook, MN

Last Updated 06/11/2021 09:36 AM
Project Title

Fremont Street Watermain Replacement

Physical Address View project details and contacts
City, State (County) Lake Benton, MN   (Lincoln County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $150,000 to $200,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Furnish and Install 688 LF of 6” diameter waterman pipe, 9 water service connections along with associated fittings and appurtenances; Furnish and Install 292 LF of 1” diameter water service line by directional drilling Furnish and Install 40 LF of concrete curb and gutter and Furnish and install 440 tons of bituminous pavement.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents