Similar Projects
Catholic Central School
Renovation, Addition
Conception
$5,000,000 est. value
Latham, NY 12110

Albany Academy STEAM Innovation Center
Addition, Demolition, Renovation, Infrastructure
Conception
$2,000,000 CJ est. value
Albany, NY 12208

Salamanca CSD Improvements - Phase 3.4
Design
Salamanca, NY 14779

Community Athletic Complex
New Construction
Design
Buffalo, NY 14216

West Seneca Central School District Capital Improvement Project 2018 Phase 3
Renovation
Bidding
$10,500,000 CJ est. value
West Seneca, NY 14224

2022-2023 Capital Outlay Project
Renovation
Bidding
$195,000 CJ est. value
Dunkirk, NY 14048

Whitney Point CSD 2021 Capital Improvement Project
Renovation
Sub-Bidding
$75,000 CJ est. value
Whitney Point, NY 13862

2022/23 Capital Outlay - K-12 Building - HVAC (MC) Contract
Renovation
Sub-Bidding
$800,000 CJ est. value
South Otselic, NY 13155

Newcomb CSD - Capital Project Renovations - Phase 1
Renovation
Post-Bid
$2,100,000 est. value
Newcomb, NY 12852

Union-Endicott CSD 2019 Capital Improvements Phase 2
New Construction
Post-Bid
$250,000 to $4,600,000 est. value
Endicott, NY 13760

Albany High School Additions and Renovations - Phase 3
Renovation, Addition
Results
Less than $41,400,000 est. value
Albany, NY 12207

Lancaster CSD Capital Improvements 2018
Renovation
Results
$397,000 to $2,457,000 est. value
Lancaster, NY 14086

Hyde Park CSD - 2018 Capital Project - Phase 2
Renovation
Construction
Staatsburg, NY 12580

CIDC Colonie II - Educational Buildings
New Construction - 206,000 SF
Construction
$51,000,000 est. value
Albany, NY 12205

Buffalo Academy of Science Charter High School Redevelopment
New Construction, Infrastructure
Pending Verification
$13,000,000 CJ est. value
Buffalo, NY 14202

Last Updated 01/19/2023 05:05 PM
Project Title

Onteora Middle School / High School Classroom Renovations - Phase 2 - General Construction

Physical Address View project details and contacts
City, State (County) Boiceville, NY 12412   (Ulster County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $824,720 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The Work of the project will be let for the following Contracts: General Construction A Bidder, upon 1) making the deposit required for the Bid Documents, 2) submitting a Proposal accompanied by a certified check or other security in accordance with the requirements contained in the plans and specifications and public advertisement for bids, and 3) retuning the plans and specifications used by such Bidder in good condition within thirty (30) days following the award of the Contract, or rejection of the Bid, shall have returned to them the full amount of the deposit for one copy of the plans and specifications. Attention of the Bidder is particularly called to the Owners sales tax exemption, the requirements as to conditions of employment to be observed, and the minimum wage rates to be paid under the Contract. In addition, the Bidding Documents contain detailed requirements for the qualification of Bidders. These include, among other things, rigid bonding and insurance requirements, financial statements, bank references, lists of lawsuits, arbitrations or other proceedings in which the Bidder has been named as a party, a statement of suretys intent to issue Performance and Payment Bonds, and a description of other projects of similar size and scope completed by the Bidder Bids shall be prepared as set forth in INSTRUCTIONS TO BIDDERS, enclosed in a sealed envelope bearing on its face the name and address of the Bidder as the title of the Work to which the bid enclosed relates. Each Bidder shall deposit with its bid, security in an amount not less than five percent (5%) of the base bid in the form and subject to the conditions provided in the INSTRUCTIONS TO BIDDERS. No Bidder may withdraw its bid within forty-five (45) days after the actual bid opening. The Owner reserves the right to waive any and all informalities in, or to reject, all bids. The Owner further reserves its right to disqualify Bidders for any material failure to comply with the INSTRUCTIONS TO BIDDER and SUPPLEMENTARY INSTRUCTIONS TO BIDDERS.

Details

Middle/Senior High School, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting and Coating, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents