Similar Projects
Roadway Minor Rehab
Infrastructure
Design
$1,132,004 CJ est. value
Lima, OH 45801

Roadway Minor Rehab
Infrastructure
Design
$1,132,004 CJ est. value
Lima, OH 45801

Culvert Invert Paving
Infrastructure
Bidding
$500,000 CJ est. value
Lima, OH 45801

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Intersection - SUM-Wooster Road Robinson
Infrastructure
Results
$1,248,937 est. value

2022 Street Surfacing Project
Infrastructure
Results
$155,449 est. value
Delphos, OH

Lima Community Aquatic Center
New Construction, Infrastructure
Pending Verification
$8,900,000 CJ est. value
Lima, OH 45801

Lima Community Aquatic Center
New Construction, Infrastructure
Pending Verification
$8,900,000 CJ est. value
Lima, OH 45801

Roadway Minor Rehab - SR 66
Infrastructure
Design
$1,501,226 CJ est. value
Delphos, OH 45833

County Roads Resurfacing
Infrastructure
Post-Bid
$1,014,974 est. value
OH

County Contract Tar and Chip Program - 22
Infrastructure
Results
$397,712 est. value
Lima, OH

Lakeview Farm Expansion
Addition, Demolition, Infrastructure - 180,000 SF
Pending Verification
$27,000,000 CJ est. value
Delphos, OH 45833

Roadway Minor Rehab - SR 696
Infrastructure
Design
$1,694,996 CJ est. value
Bluffton, OH 45817

Lawn and Jackson Water Main Replacement
Infrastructure
Post-Bid
$398,282 est. value
Bluffton, OH

Last Updated 07/25/2023 02:29 PM
Project Title

Elizabeth Street Storm Control

Physical Address View project details and contacts
City, State (County) Spencerville, OH 45887   (Allen County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Storm/Sewers, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $660,793 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The construction of 1.97 acres of wetlands through the installation of a retention system on the south side of Village limits and the installation of 682' of downstream storm pipe to replace defunct clay pipe including asphalt pavement reconstruction. Final Completion Date: May 31, 2024 Substantial Completion Date: November 17, 2023 For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents. Bidder must submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: A. Email Project Manager, (Dane M. Sommer), (dms@choiceoneengineering.com). If no response within 24 hours call (937-497-0200).

Details

Division 03 - Concrete, Precast Concrete.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents