Similar Projects
Internal Operations Center I Chiller Replacement
Alteration
Bidding
$81,500 est. value
Orlando, FL 32801

Courthouse Chiller Replacement
Alteration
Bidding
$4,988,171 est. value
Orlando, FL 32801

Ground Transportation Facility GMP 8S.1
Post-Bid
Orlando, FL 32827

Florida Southwestern State College Campus, Lee, East Yard Chiller Upgrades
Post-Bid
Fort Myers, FL 33919

Stormwater Pond Aeration Maintenance
Results
Fort Myers, FL 33913

Fountain and Pond Management Services
Results
Less than $122,303 est. value
Jacksonville, FL

PBSO, Motor Pool - Chiller and Make-up Air Replacement
Term Contract
Bidding
West Palm Beach, FL 33406

PHCD Boiler Inspections Preventive Maintenance and Repair Services Parts
Post-Bid
$80,000 est. value
Miami, FL 33138

Dyal Groundwater Filters #2 IMS Cap and Media Replacement
Results
Less than $233,928 est. value
Christmas, FL 32709

Campus Emergency Generator and Air Compressor Service and Repair
Term Contract
Bidding
Jacksonville, FL 32224

Maintenance of Town Fountains
Post-Bid
Palm Beach, FL

Mechanical, Electrical and Plumbing Services Orangewood Elementary School AHU Renovation
Results
$3,500,000 to $4,500,000 est. value
Fort Myers, FL 33901

Pumping the Grease Traps
Alteration
Bidding
Westville, FL

Water Softener Repairs
Alteration
Post-Bid
Tampa, FL

Pool Filtration Replacements at Various Pools
Results
The Villages, FL

Reported 05/13/2022 12:00 AM
Project Title

Chiller Replacement - Central Mechanical Building, CM 124

Physical Address View project details and contacts
City, State (County) Lake Worth, FL 33461   (Palm Beach County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Replacement of one chiller unit (CH-1) on the Lake Worth campus central mechanical building (CM1) including all related equipment and labor for the proper function of design. 1. Replace existing chiller CH-1 with new 750-ton unit. 2. Install FCU-1 and FCU-2. 3. Provide, install, and test new refrigerant monitoring system by owner. 4. Replace all associated equipment providing labor, materials, tools, equipment, and devices necessary for a complete and operational system in accordance with the design intent of contract documents. 5. Fully clean and leave systems in a complete and operational status. 6. Install all control valves, thermowells, chilled water piping, two (2) owner provided back draft dampers, and all electrical work associated with equipment replacement. 7. Control scope of work by owner. 8. All chiller and fan coil units to be tested and balanced by owner. 9. Palm Beach State College (PBSC) Construction Documents dated January 19, 2022; project number 01-0124-HVAC-2022, and Specifications CDE Project#: 19-041 dated January 19, 2022; indicate intent of design and shall be used for bidding purposes. 10. Provide submittals as required per construction documents. 11. Provide closing documents as required by the PBSC District Board of Trustees, State Requirements for Educational Facilities (SREF), Facilities Standards for Design, and the PBSC General Conditions of the Contract for Construction and executed Federally Funded Attestation.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Packaged Water Chillers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents