Similar Projects
Security Self Storage Inc
New Construction - 82,000 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Albuquerque, NM 87109

Rob Jaggers Main Water Line
Design
$200,000 to $400,000 est. value
NM

Roosevelt County Road Barn
New Construction
Bidding
Portales, NM 88130

Wastewater Dewatering System
New Construction
Bidding
Bayard, NM

Construction Services
Post-Bid
Bernalillo, NM 87004

Walatowa Timber Industries Waterline Construction
Post-Bid
Jemez Pueblo, NM 87024

Chamberino Mutual Domestic Water Consumer and Sewer Association Water System Improvements Project
Results
Anthony, NM 88021

2018 Colonias Water System Improvements
Results
$373,870 est. value
Lordsburg, NM 88045

3D Glass New Factory
Renovation - 15,593 SF
Construction
$13,000,000 est. value
Albuquerque, NM 817113

Netflix and ABQ Studios
New Construction - 170,000 SF
Pending Verification
$10,000,000 est. value
Albuquerque, NM

Design Bid Build Fy20 Nc3 Support War Reserve Material (Wrm), Storage/Shipping Facility, Holloman Air Force Base, Otero County, New Mexico
New Construction, Demolition - 89,945 SF
Design
$10,000,000 to $25,000,000 est. value

Finished Water 3A (FW3A) Pipeline
Bidding
Clovis, NM

P-Tunnel Waterline Replacement
Post-Bid
Albuquerque, NM 87131

Alto 2 Well (H-1979-S7) Improvements
Results
Ruidoso, NM 88345

RV Storage - Albuquerque
New Construction - 650 SF
Design
Less than $500,000 CJ est. value
Albuquerque, NM 87121

Last Updated 03/03/2021 10:32 AM
Project Title

Tsankawi Chlorination Building and WP Main Replacement NM4 and East Jemez Road

Physical Address View project details and contacts
City, State (County) Los Alamos, NM   (Los Alamos County)
Category(s) Commercial, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Warehouse/Storage, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

New chlorination facility utilizing on-site chlorine generation equipment to treat well water from the Otowi 1, Otowi 2, Pajarito 1, and Pajarito 3 wells. The chlorination facility will be located at the Pajarito 1 well site, located at approximately at the intersection of New Mexico State Road 4 (NM-4)and East Jemez Road. Chlorine generation equipment shall include the following items, and shall be provided as a package system from a single manufacturer: Water softener. Brine tank. Chlorine generation unit, capable of treating310-3595 GPM variable flows from wells. Solution storage tank. Dual pump package chemical feed system. Rectifier. Necessary filters, valves, fittings, appurtenances and controls specifically associated with the operation and functionality of the chlorine generation equipment needed to provide a complete an operable system. Building shall be a 210-sf precast concrete building with precast roof panels. The building shall have double doors on one end for access and equipment installation. Installing approximately 300-lineal feet of new 16-inch ductile iron waterline connecting the transmission piping from Pajarito. Well and Pajarito 1 Well into a single pipeline and crossing NM-4 utilizing jack and bore construction methods with a 42-inch steel casing. The 16-inch waterline shall connect to a new 16-inch waterline being constructed under a separate contract that runs along the east side of NM-4. 2-inch chlorine chemical feed linefrom the chlorination building to the injection point. The 2-inch chlorine feed line shall turn south along the east side of NM-4 and extend to the existing meter vault.3.The contractor shall install a new tap and injection quill within the meter vault for chlorine injection into the 16-inch transmission line.4.Extending potable water to the new chlorination building for chlorine generation purposes.E.Electrical components of the project shall include providing power to the Chlorination facility from the overhead power available at the Pajarito 1 Well site. Exterior wallmounted meter and transformer shall be utilized to provide a separate service from thePajarito 1 Well. The contractor shall provide instrumentation and controls as shown in the plans. F.Decommissioningand demolition of the existing chlorination building at the intersection of NM-4 and East Jemez Road

Details

1 Warehouse/Storage, 210 SF New Construction.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware, Door Hardware.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies, Flagpoles.
Division 11 - Equipment, Parking Control Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents