Similar Projects
Skyland Town Center Phase II
New Construction - 503,600 SF
Conception
$10,000,000 CJ est. value
Washington, DC 20020

Capitol Building Redevelopment
New Construction - 20,000 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Washington, DC

Bearden Arts Building
New Construction - 26,000 SF
Design
Washington, DC 20002

The Ladybird
New Construction - 13,000 SF
Design
Washington, DC 20016

Rehabilitation of Parking Garages
Renovation
Bidding
$10,000,000 est. value
Washington, DC 20001

Harvard Hall Apartments
Renovation
Bidding by Invitation
Washington, DC 20009

Temple Sinai
Renovation, Addition, Demolition - 54,325 SF
Post-Bid
Washington, DC 20015

1133 North Capitol Street
New Construction - 378,790 SF
Post-Bid
Washington, DC 20002

District of Columbia Office on Aging Wellness Centers
Renovation
Results
Less than $1,351,000 est. value
Washington, DC

Redevelopment of St. Elizabeths East Campus Parcel 6 Parking Garage
Results
$19,000,000 to $21,000,000 est. value
Washington, DC 20032

1000 South Capitol Street Southeast - Residential
New Construction - 14,000 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Washington, DC 20003

Parkside - Parcel 11
New Construction
Construction
$42,400,000 est. value
Washington, DC 20019

1318 9th Street NW
New Construction, Renovation
Pending Verification
Washington, DC

Gallaudet Parcel 2
New Construction - 40,310 SF
Pending Verification
$5,000,000 to $10,000,000 CJ est. value
Washington, DC

Westminster DC
New Construction - 18,500 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Washington, DC 20024

Last Updated 03/05/2020 02:37 PM
Project Title

Assisted Living Facility

Physical Address View project details and contacts
City, State (County) Washington, DC 20016   (District of Columbia County)
Category(s) Heavy and Highway, Religious/Funeral, Residential
Sub-Category(s) Assisted Living Facility, Parking Garage, Religious Facility
Contracting Method Qualified Bidding.
Project Status Seeking Site Plan Approvals
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Assisted Living Facility, 4 Stories Above Grade, New Construction, 86 Unit(s), Religious Facility, New Construction, Parking Garage, New Construction, 66 Parking Spaces.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework, Ornamental Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Carpeting, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Residential Equipment, Residential Appliances, Religious Equipment.
Division 12 - Furnishings, Religious Art, Specialty Casework, Religious Casework, Fixed Audience Seating, Pews and Benches.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents