Similar Projects
Swale and Culvert Work
Alteration
Post-Bid
Saint Peters, MO 63376

Plastic Pipe Liner, HDPE Pipe, and Polypropylene
Infrastructure
Post-Bid
Saint Charles, MO

Sidewalk and Drainage Improvements
Infrastructure
Results
Saint Charles, MO

Laura Drive Drainage Improvements
Infrastructure
Results
$320,000 est. value
O Fallon, MO

North Cool Springs Precast Box
Infrastructure
Post-Bid
O'Fallon, MO 63366

2021 Bank Stabilization & Navigation Project (Bsnp) Structures Repair
Term Contract
Results

Ranch Road Culvert Upgrade
Infrastructure
Post-Bid
$200,000 est. value
O'Fallon, MO

Crystal Springs Creek Bank Stabilization Project
Infrastructure
Results
Saint Charles, MO

370 Lakeside Park 2nd Entrance Embankment
New Construction
Results
Less than $75,000 est. value
Saint Peters, MO 63376

36 Sanitite Hp Triple Wall Pipe
Infrastructure
Results
O Fallon, MO

Willott Road Culvert at West Branch of Spencer Creek
Infrastructure
Results
Saint Peters, MO 63376

Geotextile Material
Infrastructure
Results
Ballwin, Beaufort, Bella Villa, Cedar Hill, Country Club Hills, Creve Coeur, Crystal Lake Park, Eureka, Festus, Normandy, Pacific, Saint Charles, Saint Clair, Saint Louis, Sappington, Wentzville, MO 63141

Corrugated Metal Pipe
Infrastructure
Results
Josephville, Saint Charles, Saint Peters, Wentzville, MO 63385

Zumbehl Road Culvert Replacement Over Cole Creek
Infrastructure
Results
Saint Charles, MO 63303

Creek Corridor Stewardship Maintenance
Infrastructure
Results
Saint Peters, MO

Last Updated 06/30/2022 12:31 AM
Project Title

Muirfield Ridge Court Retaining Wall

Physical Address View project details and contacts
City, State (County) Saint Charles, MO 63304   (Saint Charles County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $90,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project shall include all work incidental to the construction of a two-tiered modular block retaining wall at 26 Muirfield Ridge Court to be paid for by the square foot of in-place retaining wall. Mobilization, grading, backfill, topsoil, sod, and other miscellaneous restoration will be considered incidental to the project, no direct payment will be made. The successful bidder shall be required to comply with the State Statutory Provisions concerning the payment of prevailing wages on public works, Section 290.210 through 290.340 R.S. MO 1959, as amended 1969 and shall pay to all workmen performing work under this contract not less than the prevailing hourly rate of wages determined by the Department of Labor and Industrial Relation of the State of Missouri. The wage rates applicable to this project have been predetermined as required by law and are set forth in this document. Missouri Annual Wage Order 28 as amended May 13, 2021 shall be in effect for this project The bid proposal shall be made on a form provided by the County, delivered in a sealed envelope, and deposited in the office of the Finance Director on or before the time specified above. The proposal shall be accompanied by bid bond, cashier's check or certified check for an amount not less than five percent of the bid amount. The amount of the check or bid bond shall be forfeited to the County upon failure or refusal of the successful bidder to enter into a contract or to furnish bond after his proposal has been accepted. The County reserves the right to require the successful bidder to file proof of his ability to properly execute the project together with his record of successful completion of similar projects. The County reserves the right to reject any and all bids or proposals submitted, or to advertise for new bids. The County reserves the right to defer the acceptance of any proposal and the execution of a contract for a period not exceeding forty-five (45) days after the date of opening of the bids. The successful bidder to whom the contract has been awarded shall sign and return the contract and other required certificates and documents in quadruplicate within ten (10) days after the date of the receipt of the award of the contract. The successful bidder shall file certificates with the County that he has obtained and will continue to carry workmen's compensation insurance, public and private liability and property damage insurance and builders risk insurance in the specified amounts for the duration of the contract. The contractor shall not commence work prior to the date of written notice from the County Engineer to begin work and shall complete all work before September 1, 2022. Notice to Proceed is expected to be on or about August 1, 2022.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents