Similar Projects
Two Legacy West Offices
New Construction - 300,000 SF
Conception
$10,000,000 CJ est. value
Plano, TX

Lamar Boulevard Offices
New Construction - 180,000 SF
Design
$100,000,000 est. value
Austin, TX 78704

McKinney Avenue Development
New Construction
Design
Dallas, TX 75204

Stonebridge Medical Office Building Site Work
New Construction - 90,231 SF
Post-Bid
$750,000 est. value
McKinney, TX 75069

Life Time Fitness
New Construction - 253,000 SF
Post-Bid
$130,000,000 est. value
Shenandoah, TX

USACE Galveston Reconfigure Cubicles in Jadwin Building, Galveston, TX
Results
Galveston, TX 77550

Marwaha Group
Renovation - 8,244 SF
Results
$100,000 est. value
Houston, TX 77073

The Grove Office Complex
New Construction
Construction
$17,500,000 est. value
Austin, TX 78731

Stacy Green
New Construction
Construction
Allen, TX 75013

Cedar Hill Development Phase I
New Construction
Design
$10,000,000 est. value
Cedar Hill, TX 75104

Wesco Office Building
New Construction - 21,835 SF
Construction
$2,400,000 est. value
Austin, TX 78735

Office Building & Parking Garage
New Construction - 240,000 SF
Design
$10,000,000 CJ est. value
Dallas, TX 75254

Gateway 10 Business Park - Building 2
New Construction
Construction
$5,200,000 est. value
San Antonio, TX 78109

Cedar Maple Office Tower
New Construction - 654,000 SF
Design
$10,000,000 CJ est. value
Dallas, TX 75201

Paradigm Metals Headquarters
New Construction - 100,000 SF
Construction
Hutto, TX 78634

Last Updated 11/06/2019 12:10 PM
Project Title

IT Office Additions

Physical Address View project details and contacts
City, State (County) Waco, TX 76710   (McLennan County)
Category(s) Commercial
Sub-Category(s) Office
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be performed is described in general, non-inclusive terms and includes furnishing all labor, material and equipment necessary to construct the following: 1. Disassemble existing ceiling in area indicated. 2. Salvage existing doors to adjacent offices. 3. Install new walls to enclose 4 new offices. Infill door locations for adjacent offices. 4. Install 3 new doors matching existing. 5. Rehang existing doors to new door openings for adjacent offices. 6. Install 3 new variable air volume terminal units to serve new offices. 7. Tap into existing duct system and install associated ductwork. 8. Install new ceiling grid in offices. Reuse existing ceiling tiles to extent possible. 9. Reuse existing light fixtures to extent possible. 10. Install electrical power to locations indicated. 11. Install communication terminals to locations indicated. 12. Install sound dampening insulation above ceiling in areas indicated.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 10 - Specialties, Signage.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 32 - Exterior Improvements.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents