Similar Projects
Last Updated 05/20/2021 10:27 AM
Project Title

Forrest and Long, French Road, M.L. King, Jr, and Verone Lift Station Rehabilitation

Physical Address View project details and contacts
City, State (County) Beaumont, TX 77726   (Jefferson County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $810,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This contract shall provide for rehabilitation of five (5) sanitary sewer lift stations for the City of Beaumont in Jefferson County, Texas. The lift stations are located on Spindletop Road, Forrest Street, French Road, M.L. King, Jr. Parkway, and Verone Street. This contract shall include all necessary superintendence, labor, equipment, tools, materials, painting, safety measures, environmental protection, disposal of surplus items, site restoration, and all other related construction for the proposed lift stations. Spindletop Lift Station: 1. Contractor shall remove and dispose of the existing pneumatic pumping system in its entirety, including compressor equipment, piping, inductor assembly, dry well structure and all appurtenances all in strict accordance with the plans and specifications. 2. Contractor shall remove and dispose of the existing bypass valve box and salvage the existing valve assembly for the Owner. 3. Contractor shall remove the existing 4” influent gravity sewer line from the existing manhole and install a new 6” SDR-26 PVC pipe from the existing manhole to the proposed wet well all in strict accordance with the plans and specifications. 4. Contractor shall install a new packaged grinder lift station including connection of the influent 6” gravity sewer line, 2” SDR-26 PVC force main to the existing force main, vent stack, and electrical connection to the provided control panel all in accordance with the plans and specifications. 5. Contractor to furnish and install all electrical equipment, controls, conduit and conductors all in accordance with the electrical plans and specifications. 6. Contractor shall provide surface restoration including sodding of the site all in accordance with the plans and specifications. 7. Provide ALL BYPASS PUMPING as required to maintain sewer flow during construction all in accordance with plans and specifications. Forrest & Long Lift Station: 1. Contractor shall remove and dispose of the existing pneumatic pumping system in its entirety, including compressor equipment & housing, piping, inductor assembly and all appurtenances all in strict accordance with the plans and specifications. 2. Contractor shall remove the existing wet well and construct a new sanitary sewer lift station, including 5’6” diameter RCP wet well and 4’ diameter RCP valve vault, top and bottom slabs, submersible pumps, pump rails, piping, fittings, valves, hatches, vent stack, electrical connection to the provided control panel, and all required appurtenances to make the lift station complete and operable all in accordance with the plans and specifications. 3. Contractor to furnish and install all electrical equipment, controls, conduit and conductors all in accordance with the electrical plans and specifications. 4. Contractor to connect the new 4” force main piping to the proposed sanitary sewer manhole all in accordance with the plans and specifications. 5. Contractor shall install a new 48” fiberglass manhole all in strict accordance with the plans and specifications. 6. Contractor shall coat all exposed piping including surface preparation all in accordance with the plans and specifications. 7. Contractor shall coat all interior concrete surfaces of the wet well in accordance with the manufacturer’s recommendations and the plans and specifications. 8. Contractor shall provide humidity control of the wet well during the coating application in accordance with the manufacturer’s recommendations. 9. Contractor shall provide surface restoration including sodding of the site all in accordance with the plans and specifications. 10. Provide ALL BYPASS PUMPING as required to maintain sewer flow during construction all in accordance with plans and specifications. French Road Lift Station: 1. Contractor shall remove and dispose of the existing pneumatic pumping system in its entirety, including compressor equipment & housing, piping, inductor assembly and all appurtenances all in strict accordance with the plans and specifications. 2. Contactor shall remove the existing wet well and install a new packaged grinder lift station including connection of the influent 6” gravity sewer line, 2” SDR-26 PVC force main to the existing manhole, vent stack, and electrical connection to the provided control panel all in accordance with the plans and specifications. 3. Contractor to furnish and install all electrical equipment, controls, conduit and conductors all in accordance with the electrical plans and specifications. 4. Contractor shall provide surface restoration including sodding of the site all in accordance with the plans and specifications. 5. Provide ALL BYPASS PUMPING as required to maintain sewer flow during construction all in accordance with plans and specifications. M.L. King, Jr. Lift Station: 1. Contractor shall remove and dispose of the existing pneumatic pumping system in its entirety, including compressor equipment & housing, piping, inductor assembly and all appurtenances all in strict accordance with the plans and specifications. 2. Contactor shall remove the existing wet well and install a new packaged grinder lift station including connection of the influent 6” gravity sewer line, 2” SDR-26 PVC force main to the existing manhole, vent stack, and electrical connection to the provided control panel all in accordance with the plans and specifications. 3. Contractor to furnish and install all electrical equipment, controls, conduit and conductors all in accordance with the electrical plans and specifications. 4. Contractor shall provide surface restoration including sodding of the site all in accordance with the plans and specifications. 5. Provide ALL BYPASS PUMPING as required to maintain sewer flow during construction all in accordance with plans and specifications. Verone Lift Station: 1. Contractor shall remove and replace the 4” DI pump discharge piping on both pumps inside the wet well, including the 90-degree bends, couplings, reducers, check valves, and gate valves all in accordance with the plans and specifications. 2. Contractor shall coat all exposed piping including surface preparation all in accordance with the plans and specifications. 3. Contractor shall remove the existing coating, pressure wash, remove and dispose of debris from the wet well all in accordance with the plans and specifications. 4. Contractor shall restore the wet well concrete surface to its original thickness all in accordance with the plans and specifications. 5. Contractor shall coat all interior concrete surfaces of the wet well all in accordance with the manufacturer’s recommendations and the plans and specifications. 6. Contractor shall provide humidity control of the wet well during the coating application in accordance with the manufacturer’s recommendations. 7. Provide ALL BYPASS PUMPING as required to maintain sewer flow during construction all in accordance with plans and specifications.

Details

Lift and Pump Stations, New Construction.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents