Similar Projects
2022 Chip Seal Program
Infrastructure
Bidding
MO

Crack Fill at Various Locations
Infrastructure
Bidding
$97,000 est. value
Columbia, MO

2021 Road Improvements
Post-Bid
Indian Point, MO

Repair Gravel Roadways - Disaster 4451
Infrastructure
Post-Bid
Less than $323,868 est. value
Craig, MO

Sunridge Park Asphalt and Sealing Project 2021
Results
Hillsboro, MO 63050

Repave Streetscape at Justice Center
Results
Ballwin, MO 63011

Mill and Overlay FY23 Program
Infrastructure
Bidding
$200,000 est. value
MO

Aquatic Center Parking Lot Asphalt and Curb Maintenance
Infrastructure, Alteration
Post-Bid
Willard, MO 65781

2021 Intermediate Maintenance Program
Results
Gladstone, MO

Drainage and Street Improvements
Infrastructure
Bidding
$300,000 est. value
East Prairie, MO

150 Two Span Pre-stressed I Girder Bridge and Roadway
New Construction, Infrastructure
Post-Bid
MO

Street Cut Repairs
Results
Independence, MO

Asphalt overlay / Patching and Sealing / Striping of Parking Lot
Infrastructure
Bidding
$200,000 est. value
Florissant, MO

Muegge Road
New Construction, Infrastructure
Post-Bid
Saint Charles, MO 63302

Pavement Repairs at District Transportation Building
Results
Grandview, MO 64030

Reported 04/16/2022 12:00 AM
Project Title

Resurface

Physical Address View project details and contacts
City, State (County) (Schuyler, Scotland Counties)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $1,500,000 to $2,500,000
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Route a Schuyler County. Resurface From Route 136 in Downing to Adair County Line 1.0 Mile South of Route T, the Total Length of Improvement Being 10.404 Miles.(2): Job J2mamd09 Route M Scotland County. Resurface From Route W to Route a Near Rutledge, the Total Length of Improvement Being 3.061 Miles(3): Job J2mamd11 Route W Scotland County. Resurface From Route 15 to Route M, the Total Length of Improvement Being 4.796 Miles

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents