Similar Projects
Full Delivery of Reforestation Acreage FY22
Alteration
Bidding
Annapolis, MD

Full Delivery of Turnkey Water Quality Improvements FY22
Infrastructure
Bidding
Annapolis, MD

Granular Activated Carbon Filtration System Installation and Maintenance
Term Contract
Post-Bid
$500,000 to $1,000,000 est. value

Valve and Fire Hydrant Assessment Operation and Maintenance
Term Contract
Post-Bid
$8,000,000 est. value
Baltimore, MD 21270

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Area Water And Sewer House Connection Construction
Term Contract
Results
Laurel, MD 20707

Water Main - Harry South Truman Parkway - Inspection and Replacement
Infrastructure
Bidding
$250,000 to $500,000 est. value
MD

Galvanized Pipe Replacement (RGH)
Post-Bid
Laurel, MD 20707

San Juan Drive Water Main Replacement
Results
Laurel, MD

On-Call Water and Sewer Utility Contractor Services
Term Contract, Infrastructure
Bidding
Annapolis, MD

Task Order 80 - Fitzpatrick Water Main Replacement
Infrastructure
Post-Bid
Laurel, MD 20707

RT3 Water Main Crossing
Results
$100,000 to $500,000 est. value
MD

Watermain Replacement - Glen Burnie and Pasadena
Infrastructure
Bidding
$1,000,000 to $1,500,000 est. value
Glen Burnie, Pasadena, MD

Utility Construction Materials
Infrastructure
Post-Bid
Annapolis, MD

Tanyard Springs Road Widening and Water Main
Results
$1,000,000 to $1,500,000 est. value
Annapolis, MD 21401

Last Updated 12/02/2021 10:07 AM
Project Title

Marley SPS FM ARV Replacement

Physical Address View project details and contacts
City, State (County) Annapolis, MD   (Anne Arundel County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,000,000 to $2,000,000
Plans Available from County Agency - 10/25/21
Owner View project details and contacts
Architect View project details and contacts
Description

The Work includes the following major items: The removal and replacement of approximately 180 linear feet of the existing 30-inch diameter force with ductile iron pipe, removal of existing air valve with vault and installation of four combination air/vacuum valve in vaults, line stopping with temporary bypass piping.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents