Similar Projects
Gravel Street Pump Station Electrical/Mechanical Upgrades
Bidding
Groton, CT

Plantsville Pump Station Rehabilitation Project
Renovation
Bidding
$825,000 est. value
Southington, CT 06489

Batterson Park Pump Station Upgrade
Renovation
Post-Bid
$1,700,000 est. value
Farmington, CT

Provision and Installation of a Prefabricated Pump Station
Post-Bid
Groton, CT 06340

WPCF Plant and Pump Station Fiber Connection Installation
Results
$50,000 to $130,000 est. value
Plainville, CT

Pump Stations Resiliency Implementation
Results
New Haven, CT

Construction of Stormwater Pumping Station, Stratford, CT
Post-Bid
$5,000,000 to $10,000,000 est. value
Stratford, CT

2020 Maintenance and Operation of Mansfield Pump Stations
Results
Mansfield, CT

Evergreen Avenue and Blue Hills Pump Stations HVAC Improvements
Post-Bid
Waterford, CT 06385

Wastewater Pump Stations Rehabilitation Project
Renovation
Results
Stafford, CT 06615

Reservoir Avenue and Old Town Road Pump Station Upgrades
Renovation
Post-Bid
Trumbull, CT 06611

James Street Siphon Station Upgrades Project
Results
New Haven, CT 06512

Easton Turnpike Pump Station and Force Main Replacement
Results
Fairfield, CT 06824

Woodbridge Lane, Ridgewood Acres and Woodbridge Lane Pump Station Reconstruction Project
Renovation
Results
$1,000,000 to $2,499,999 est. value
Thomaston, CT 06787

Route 133 Pump Station Improvements
Results
Brookfield, CT

Last Updated 08/24/2020 07:40 AM
Project Title

Steele Street Pump Station Modifications

Physical Address View project details and contacts
City, State (County) New Britain, CT   (Hartford County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $443,700
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Steele Street Pump Station Modifications Project includes furnishing and installing skid-mounted domestic pumps, variable frequency drives to control the two existing high-flow pumps and the skid-mounted domestic pumps, a diesel engine driven standby generator set and automatic transfer switch, and piping and valving modifications within the Pumping Station. Work also includes updates to the existing instrumentation and SCADA system. The existing hydropneumatic tank is to be permanently abandoned in place under this Project.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents