Similar Projects
HVAC and Mechanical Products
Term Contract
Post-Bid

Heat Exchanger Tube Bundles
Results

Make Up Air Unit Removal and Replacement
Results
Steamboat Springs, CO 80487

CU Denver PN20-112394 - SCPP Only
Alteration
Results
$125,000 est. value
Denver, CO 80204

LSC Replace HVAC Heating Zone Valves
Alteration
Results
$125,000 est. value

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

IT Server Room HVAC
Alteration
Post-Bid
CO

USAFA Fy22 Grease Laden Duct Cleaning Service
Term Contract
Post-Bid

Owner’s Representative for Tenth Street Fire Station and City Hall
New Construction - 8,332 SF
Results
$6,500,000 to $16,200,000 CJ est. value
Steamboat Springs, CO 80487

DINO-Housing HVAC Installation
Term Contract
Results
Yampa, CO - Green River, UT

New Fire Station and City Hall
New Construction
Conception
$10,911,277 est. value
Steamboat Springs, CO 80487

Replace HVAC System #49 Replace Water Soft #118
Alteration
Post-Bid

Academic Center Heat Trace Replacement
Alteration
Results
$1,500,000 est. value
Steamboat Springs, CO 80487

Construction Manager at Risk - Fire Station and City Hall
New Construction
Post-Bid
$9,000,000 est. value
Steamboat Springs, CO

Terminal Boiler Replacements Yampa Valley Regional Airport (YVRA)
Renovation
Post-Bid
$100,000 CJ est. value
Hayden, CO 81639

Last Updated 08/05/2022 11:05 AM
Project Title

HVAC Controls

Physical Address View project details and contacts
City, State (County) Steamboat Springs, CO 80487   (Routt County)
Category(s) Government/Public, Single Trades
Sub-Category(s) Capitol/Court House/City Hall, HVAC
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Steamboat Springs is soliciting proposals from qualified HVAC controls contractors to upgrade the existing Loytech system at our Centennial Hall facility at 124 10th Street (photo of existing controls and control drawings attached). This proposal shall include the installation of a new supervisor and integration with all existing devices and equipment, a maintenance proposal for the new system should also be included. This is to be considered Phase One of a multiphase, multiyear project to install new controls systems or upgrade existing systems, initially at five additional facilities, with the contractor selected to be considered the preferred contractor for future work.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents