Similar Projects
Furnish and Install Emergency One-Touch Lockdown System
Renovation
Sub-Bidding
$1,100,000 CJ est. value
Pittsburgh, PA 15212

Furnish/install Signage for Workforce Development Training Center Alegheny Campus
Infrastructure
Sub-Bidding
$50,000 CJ est. value
Pittsburgh, PA 15212

Soil Disposal for Four LNA Sites
Alteration
Post-Bid

Professional Lead-Based Paint Risk Assessment for the Manchester Neighborhood
Alteration
Post-Bid
Pittsburgh, PA 15289

Remedial Investigations for Per- and Polyfluoroalkyl Substances (PFAS) Impacted Areas at Army Installations in the Northeast Region
Results

Blight Removal Program
Demolition, Infrastructure, Alteration
Results
Less than $25,000 est. value
Wilkinsburg, PA

State Correctional Institution (SCI) Pittsburgh - Demolition - Phase 1
Demolition, Infrastructure
Sub-Bidding
$3,500,000 CJ est. value
Pittsburgh, PA 15233

Environmental Remediation Services
Term Contract
Post-Bid

Demolition and Asbestos Abatement of Various Structures
Demolition, Alteration
Results
$40,000 est. value
Bridgeville, PA

Sub-Slab Vapor Testing for the Manchester Redevelopment
Alteration
Post-Bid
Pittsburgh, PA 15233

Various Boroughs and Townships Projects
Demolition, Infrastructure, Alteration
Results
$60,000 est. value
Bridgeville, McKees Rocks, Pittsburgh, PA 15136

Soil Disposal At 29 LNA Sites
Term Contract, Alteration
Post-Bid

906 Quaill Avenue Garage Demolition
Demolition, Infrastructure
Results
$10,000 CJ est. value
Pittsburgh, PA 15202

2022 Demolition - North Versailles Township
Demolition, Infrastructure
Post-Bid
$50,000 CJ est. value
North Versailles, PA 15137

Act 152 Demolition - Borough of Braddock
Demolition, Infrastructure
Results
$41,500 CJ est. value
Braddock, PA 15104

Last Updated 03/28/2023 01:38 PM
Project Title

Demolition of Underutilized and Obsolete Buildings Pennsylvania Western University at Edinboro

Physical Address View project details and contacts
City, State (County) Gibsonia, PA 15044   (Allegheny County)
Category(s) Single Trades
Sub-Category(s) Environmental
Contracting Method Competitive Bids
Project Status Results, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $3,162,718 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Contract No. DGS 0406 - 0060 Phase 1.1 - General Construction Contract Number................................. C-0406-0060.1 - General A. The Work of this Project consists of, but is not necessarily limited to, the following. Detailed requirements of the Work are described in the pertinent specification Sections and/or shown on the Drawings. B. General Construction (.1) Contract: 1. Hazardous materials abatement as indicated. 2. Full facility demolition of the Miller Research Center, Rose Hall, Dearborn Hall, Earp Hall, Centennial Hall, Earlley Hall, and Boiler House facilities 3. Regrading and restoration of all seven sites following removal of buildings. 4. Reconstruction and extension of sidewalks, curbs, etc, following the removal of buildings. 5. Disconnection of each facility slated for demolition from campus utilities, including, but not limited to, steam, sanitary, stormwater, and domestic water lines. 6. Disconnection of each facility from incoming electrical services, including general make safe activity prior to demolition. ESTIMATED RANGE: .1 General - $6,000,000 - $7,000,000 LIQUIDATED DAMAGES = (.1) $1,750.00 per day per day. There is no Bid Guaranty required for this Project. The Department of General Services Public Works and the Bureau of Diversity, Inclusion and Small Business Opportunities (BDISBO) identified this procurement as eligible for the setting of Small Diverse Business (SDB) and/or Veteran Business Enterprise (VBE) participation goals. However, BDISBO did not set SDB and/or VBE participation goals for those procurements that are less than the $400,000 threshold required to set either goal. In addition, there will be no points allocated toward SDB/SB participation for this procurement. This is a significant programmatic change from the SDB and SB Participation program contained in prior Projects issued by Public Works. Bidders now must agree to meet the SDB and VBE Participation Goals in full or demonstrate that they have made Good Faith Efforts to meet the Goals. Refer to the Instructions to Bidders section regarding Small Diverse Business and Veteran Business Enterprise Participation for further information. The Goals for each Prime Contract is as follows: SDB AND VBE GOALS .1 General Construction - ALL BASE BIDS (#1 & #2) SDB = 0% VBE = 0% All proposers must be registered to view/download Plans and Specifications and must have a Current, Active Vendor Number. To register click the following link: register Duration: 404 Calendar Days from date of initial job conference *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The Work of this Project consists of, but is not necessarily limited to, the following. Detailed requirements of the Work are described in the pertinent specification Sections and/or shown on the Drawings. B. General Construction (.1) Contract: 1. Hazardous materials abatement as indicated. 2. Full facility demolition of the Miller Research Center, Rose Hall, Dearborn Hall, Earp Hall, Centennial Hall, Earlley Hall, and Boiler House facilities 3. Regrading and restoration of all seven sites following removal of buildings. 4. Reconstruction and extension of sidewalks, curbs, etc, following the removal of buildings. 5. Disconnection of each facility slated for demolition from campus utilities, including, but not limited to, steam, sanitary, stormwater, and domestic water lines. 6. Disconnection of each facility from incoming electrical services, including general "make safe" activity prior to demolition. Full facility demolition of seven (7) underutilized or otherwise obsolete buildings at PennWest Edinboro's campus Question Deadline 03/14/2023 Questions during the bid stage shall be submitted via e-Builder under the Q&A Board tab in the Package's Invitation to Bid. Bid Results Base Bid 1 Safeco Services - $2,523,890.25 Base Bid 2 Reclaim Company LLC - $638,828.00

Details

Division 01 - General Requirements, Special Procedures, Environmental Procedures.
Division 02 - Existing Conditions, Environmental Assessment, Hazardous Material Assessment, Site Remediation, Asbestos Remediation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents