Similar Projects
Jesuit Academy Expansion
New Construction, Addition, Demolition, Alteration - 50,000 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Chicago, IL 60644

New Hope Academy Expansion
Build-Out - 9,600 SF
Design
Arlington Heights, IL 60004

2021 Washroom and Life Safety Work
Renovation
Post-Bid
Palatine, IL 60067

Phase IV Group 2 STR
Post-Bid
Chicago, IL 60651

Secure Vestibule Renovations at Multiple Sites
Renovation
Results
Elk Grove Village, IL 60007

Old Orchard Junior High School - Corridor Code Compliance - BP #1 - General Trades
Results
Skokie, IL 60076

Arie Crown Hebrew Day School
Renovation, Addition - 165,000 SF
Construction
$20,000,000 est. value
Skokie, IL 60076

Arie Crown Hebrew Day School
Renovation, Addition - 165,000 SF
Construction
$20,000,000 est. value
Skokie, IL 60076

East Building Addition Phase II
Addition
Post-Bid
Lincolnshire, IL 60069

Interior and Stairway Renovations
Renovation
Results
Less than $400,000 est. value
Chicago, IL 60653

Worth Elementary
Renovation, Addition
Construction
Worth, IL 60482

Maine South High School
Post-Bid
Park Ridge, IL

South School HVAC Upgrades - Bid Package #1
Results
Glencoe, IL 60022

Prairie MS Campus and Station MS Campus
Post-Bid
Barrington, IL

Nixon ES - Gym Renovation
Renovation
Results
Chicago, IL 60639

Last Updated 03/29/2022 11:42 PM
Project Title

CPS Eberhart ES - Hubbard HS - Hurley ES Roofing

Physical Address View project details and contacts
City, State (County) Chicago, IL 60629   (Cook County)
Category(s) Education
Sub-Category(s) Elementary School, Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $10,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Eberhart: The work includes: Roof hatch removal and replacement. The removal and reinstallation of parapet copings. Interior water damage repairs with new finishes. Accessibility and finish repairs at Polling Place location. Parking lot repairs and trash enclosures. Hurley: The work includes: Roof hatch removal and replacement. The removal and reinstallation of parapet copings. Interior water damage repairs with new finishes. New interior finishes and fixtures at the toilet rooms of two Pre-K classrooms. New casework, sinks, and drinking fountains at two Pre-K classrooms. Hubbard: The work includes: Roof hatch and access door removal and replacement, Window replacement at isolated locations of raised sills. Structural infills at the roof level where skylights have been abandoned. Interior water damage repairs with new finishes.

Details

Elementary School, Renovation, Middle/Senior High School, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents