Similar Projects
Reported | 06/04/2021 12:00 AM |
Project Title | Goshen Town Spring Improvements Project 2021 |
Physical Address | View project details and contacts |
City, State (County) | Goshen, UT (Utah County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Dam/Tunnel |
Contracting Method | Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Engineer - 05/10/21 |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Work includes constructing a new cutoff wall in the spring tunnel, a new spring overflow line, a new high overflow line by coring through bedrock near the tunnel entrance, a new concrete metering vault, new spring supply line inlet piping, and an air gap structure at the tank site with interconnect piping and drain line. The project will be performed in two phases. The first phase will include the tank site improvements. The second phase will include the spring site improvements and will commence on or after October 1, 2021 once irrigation demand has decreased. |
||||||
Details | Dam/Tunnel, New Construction.
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |