Similar Projects
O.N. Stevens Water Treatment Plant Filtration System Hydraulic Improvements - 21003 - City of Corpus Christi
Renovation
Conception
$6,000,000 CJ est. value
Corpus Christi, TX 78401

O.N. Stevens Water Treatment Plant Improvements - E13051 - City of Corpus Christi
Renovation, Infrastructure
Conception
$5,410,000 CJ est. value
Corpus Christi, TX 78401

Greenwood Wastewater Treatment Plant Process Upgrade - 18069A - City of Corpus Christi
Renovation
Design
$38,705,930 CJ est. value
Corpus Christi, TX 78417

Whitecap Wastewater Treatment Plant (WWTP) Improvements - 18087 - City of Corpus Christi
Renovation
Design
$12,616,727 CJ est. value
Corpus Christi, TX 78418

Maintenance and Repair Services for Odor Control Systems
Renovation
Post-Bid
$215,000 est. value
Corpus Christi, TX

Whitecap Wastewater Treatment (WWTP) Fencing Improvements
Infrastructure
Post-Bid
$200,000 CJ est. value
Corpus Christi, TX 78418

Aeration Coarse Bubble Improvements
Renovation
Results
$4,107,000 est. value
Corpus Christi, TX

O.N. Stevens Water Treatment Plant Filter Building Rehabilitation - Phase 2
Renovation
Results
$1,341,176 CJ est. value
Corpus Christi, TX 78410

O. N. Stevens Water Treatment Plant Solids Handling & Disposal Facilities
Renovation
Pending Verification
$42,864,000 CJ est. value
Corpus Christi, TX 78401

Seawater Desalination Plant - E15117 - City of Corpus Christi
New Construction, Infrastructure
Pending Verification
$188,570,000 CJ est. value
Corpus Christi, TX 78401

Allison Wastewater Treatment Plant Improvements and Lift Station Upgrade - E10043 - City of Corpus Christi
Renovation, Infrastructure
Conception
$18,058,066 CJ est. value
Corpus Christi, TX 78410

O.N. Stevens Water Treatment Plant Clearwell No. 3, Project
Renovation
Post-Bid
$25,019,905 CJ est. value
Corpus Christi, TX 78410

Whitecap Wastewater Treatment Plant Improvements
Renovation
Results
$12,284,000 est. value
Corpus Christi, TX 78418

Old Broadway Wastewater Plant Decommission - E12159 - City of Corpus Christi
Renovation
Conception
$7,060,900 CJ est. value
Corpus Christi, TX 78401

Restoration of S.E.A. District Water Features - Part 1 Water Gardens Fountain
Renovation, Infrastructure
Post-Bid
$320,000 CJ est. value
Corp Christi, TX 78401

Last Updated 04/03/2023 08:04 AM
Project Title

O.N Stevens Water Treatment Plant Electrical Distribution Improvements - 21030 - City of Corpus Christi

Physical Address View project details and contacts
City, State (County) Corpus Christi, TX 78401   (Nueces County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project is the second phase of plant-wide electrical upgrades at ONSWTP with focus on improving reliability and resilience of Plant's electrical infrastructure, including preliminary design for a detailed condition assessment with development of construction documents, and construction phase services. Improvements include redundant power feed for the pumping complex, replacement of protection equipment that has reached end of service life, integration of power protection equipment into real-time monitoring and diagnostic network. Scope of services also includes technical assistance with troubleshooting electrical and instrumentation issues, configuration, modeling, condition assessment, and electrical system documentation management. This project is included in the city's 2023-2025 Capital Improvement Plan (CIP). As of February 2, 2023, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents