Similar Projects
Open Space and Mountain Parks Historical Architectural Services for Historic Farm House
Design
Boulder, CO 80301

A & E Multiple Award Task Order Contract (MATOC)
Design
$3,500 to $100,000,000 est. value

Hygiene Dairy Agricultural Open Space Produce Wash Shed Construction Project
New Construction, Alteration
Bidding
$300,000,000 est. value
Longmont, CO 80503

RFQ - Professional Engineering Services on-call Basis for the Parks and Open Space Department
Term Contract
Bidding
Boulder, CO 80302

Engineering, Planning and Development
Post-Bid

Architect-Engineering (AE) Indefinite Delivery Contract (IDC) in Support of the Defense Health Agency (DHA) and Component Medical Commands
Post-Bid
Less than $45,000,000 est. value
Washington, DC

Nationwide Architect and Engineering IDIQ - Small Business Pool
Results
Less than $10,000,000 est. value

Sources Sought Synopsis for United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Results
$3,000,000 to $15,000,000,000 est. value

CP278574 - EC - ECAE/ECNT - Renovations
- 55,477 SF
Construction
Less than $24,000,000 est. value
Boulder, CO 80309

Chey-Maint - 2021
Construction
Less than $1,261,000 est. value
Boulder, CO 80303

Full Service Design IDIQ
New Construction
Design

IDIQ Contract for Architect-Engineer Services for Compliance with Air Emission Regulations, EPCRA Regulations, Greenhouse Gas & All Other Environmental Media Regulations
Post-Bid

Water Tank Inspections, OCONUS and CONUS
Results
$10,000 to $5,000,000 est. value

Central Region AE IDIQ
New Construction, Term Contract
Design
$25,000,000 est. value

Architect and Engineering Services for Production Technical Services (PTS) for FEMA's Risk MAP Program
Post-Bid
$10,000 to $300,000,000 est. value

Last Updated 08/02/2022 08:34 AM
Project Title

RFP - 2022 Internal Decarbonization Plan

Physical Address View project details and contacts
City, State (County) Louisville, CO 80027   (Boulder County)
Category(s) Government/Public, Professional Services
Sub-Category(s) Architectural, Misc. Buildings
Contracting Method Competitive Bids
Project Status Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

In August of 2019, the Louisville City Council passed Resolution 25, Series 2019, which set clean energy and carbon emission reduction goals for the municipality and larger community. This resolution sets goals to meet all of Louisville's municipal electric needs with 100% carbon-free sources by 2025 and to reduce core municipal greenhouse gas emissions annually below the 2016 baseline through 2025. As a result, the City is seeking a complete engineering, mechanical and financial analysis for each of its municipal facilities (ten facilities in total, some of which consist of multiple buildings) and associated fleet and equipment. The final deliverable for this project will include a strategic roadmap for electrification and decarbonization of all City buildings, fleet, equipment and operations by 2030. Question Acceptance Deadline 08/12/2022 07:00 PM EDT Questions are submitted online No The method of contractor selection has not been determined at this time.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents