Similar Projects
Electrical Services-Campus Wide
Term Contract
Sub-Bidding
Montgomery, AL 36104

Annual Traffic Signal Repair
Term Contract
Sub-Bidding
Bay Minette, AL 36507

Electrical Services
Alteration
Post-Bid
AL

Re-Roofing Various Buildings and Miscellaneous HVAC/Electrical Work
Alteration
Post-Bid
$300,000 est. value
Talladega, AL 35160

Jones Bluff Intake Crane Power Rail And Brake Replacement
Term Contract
Results
Selma, AL 36703

Jones Bluff Intake Crane Power Rail And Brake Replacement
Term Contract
Results
Selma, AL 36703

Head of Slip C Light Pole Damage
Infrastructure
Construction
$47,900 CJ est. value
Mobile, AL 36602

Opelika Parks & Recreation Calhoun Complex Retrofit Lighting Project
Renovation
Sub-Bidding
$55,000 CJ est. value
Opelika, AL 36801

400-Watt Equivalent LED Flood Light Fixtures
Term Contract
Post-Bid
Dothan, AL

Central Utility Plants Variable Frequency Drives Replacement
Alteration
Results
$2,800,000 est. value
Birmingham, AL 35249

Installation of a New Standby Generator
Alteration
Post-Bid
Gulf Shores, AL

Lightning Protection Project
Term Contract
Results
Grant, AL

Solar Lights and Light Poles
Term Contract
Post-Bid
Mobile, AL 36602

Electric Motor, SCADA and Rotating Services
Alteration
Results
$50,000 est. value
Alexander City, AL

100W LED Security Light Fixture
Alteration
Post-Bid
Dothan, AL

Last Updated 08/07/2023 09:58 PM
Project Title

Roadway Lighting Installation on SR-2 (US-72)

Physical Address View project details and contacts
City, State (County) Hollywood, AL 35752   (Jackson County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids
Project Status Results, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $198,990 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

for constructing the Roadway Lighting Installation on SR-2 (US-72) from the junction of Adams Street to the intersection of CR-85 (Bank Street) in Stevenson. Length 0.189 mi. The Bracket Estimate on this project is from $172,291 to $210,578 . Contract Time: 30 Working Days If further clarification is needed, please contact the Plans and Proposal Section of the Bureau of Office Engineer with any questions you may have. We strongly encourage you to e-mail us at offengr@dot.state.al.us. We will work with you to resolve any issues. The total amount of uncompleted work under contract to a contractor must not exceed the amount of his or her qualification certificate. Minimum Wage Rates have been pre-determined by the Secretary of Labor and are set forth in the advertised specifications. Federal Aid Projects are also subject to the contract work hours and Safety Standards Act and its implementing regulations. Cashier's check or bid bond for 5% of bid (maximum - $50,000.00) made payable to the Alabama Department of Transportation must accompany each bid as evidence of good faith. The Alabama Department of Transportation, proposals will be issued only to prequalified contractors or their authorized representatives, upon requests that are received before 10 AM., on the day previous to the day of opening of bids. The bidder's proposal must be submitted on the complete original proposal furnished him or her by the Alabama Department of Transportation. The right to reject any or all bids is reserved. ALDOT - Call Order 040 - Roadway Lighting Installation on SR-2 (US-72) *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents