Similar Projects
Sycamore Road Self-Storage Facility
New Construction, Infrastructure
Conception
$600,000 CJ est. value
Dekalb, IL 60115

2024 Bond - Central School District 301
New Construction, Infrastructure, Renovation
Conception
$195,000,000 CJ est. value
Sycamore, IL 60178

First United Methodist Church
New Construction, Infrastructure - 10,986 SF
Design
$600,000 CJ est. value
Dekalb, IL 60115

Kraft Heinz Distribution Center at Chicago West Business Center
New Construction, Infrastructure - 775,000 SF
Design
$400,000,000 CJ est. value
Dekalb, IL 60115

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Pavement Patching
Infrastructure
Post-Bid
$300,000 CJ est. value
Lockport, IL 60441

Milling and Resurfacing, Preparation of Base and Aggregate Base Repairs
Infrastructure
Results
IL

Resurfacing Suydam Road from Rollo Road to IL 23
Infrastructure
Results
$2,000,000 est. value
IL

Construct Northern Illinois Center for Community Sustainability - Northern Illinois University
New Construction, Infrastructure - 30,000 SF
Pending Verification
$24,000,000 CJ est. value
Dekalb, IL 60115

McDonald's Remodel / DeKalb
Infrastructure, Build-out
Pending Verification
$1,000,000 CJ est. value
Dekalb, IL 60115

Milling and Resurfacing on IL 38. Some ADA Work and Traffic Signal Improvements Are Proposed
Infrastructure
Post-Bid
$2,000,000 CJ est. value
Dekalb, IL 60115

Resurfacing, HMA Shoulders and Pavement Markings on North First Street from Bethany Road to Old State Road
Infrastructure
Results
$2,000,000 est. value
IL

Lacey's Place
New Construction, Renovation, Infrastructure - 2,000 SF
Pending Verification
$300,000 CJ est. value
Dekalb, IL 60115

RFQ - Various Phase I/II Projects, Various Routes, Various Counties
Term Contract
Post-Bid
$4,000,000 CJ est. value
Dixon, IL 61021

Milling and Resurfacing IL 38 (2.5" to 3.75") from 5th St
Infrastructure
Results
Dekalb, IL

Last Updated 10/16/2023 10:42 AM
Project Title

2023 Genoa Downtown Streetscape Project

Physical Address View project details and contacts
City, State (County) Genoa, IL 60135   (DeKalb County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $900,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Proposals are now being accepted for the 2023 Genoa Downtown Streetscape project which is located along Illinois Route 72 from Washington Street to Sycamore Street in Genoa, Illinois. The improvements include Removal & Replacement of PCC Sidewalk/Curb & Gutter, Brick Pavers, Stamped & Colored Concrete, Street Lighting, Electrical Conduit, Electrical Service to Street Lighting, Pavement Markings, and Beautification Landscaping. Each proposal must be accompanied by a certified check, cashiers check, or bid bond, payable to the City of Genoa for the amount not less than five percent (5%) of the total amount of the proposal. All bidders shall note the following: (1) construction monies will be drawn from local funds on hand: (2) the successful contractor will be paid on a monthly basis according to the approved estimate of completed work: (3) the City strongly urges all contractors to employ the use of local subcontractors, suppliers, and trades as much as possible for this contract. Labor rates shall be in accordance with the General Prevailing Rate of Wages for the City of Genoa, DeKalb County, Illinois, and which are on file in the Office of the Department of Labor, Springfield, Illinois. Such rates shall be paid for all laborers, workman, or tradesman performing work under this contract. The City reserves the right to reject any or all bids on each proposal, and to waive any information there in or to accept any proposal considered in the best interest of the City. No bid shall be withdrawn after the opening of bids without written consent of the City of Genoa for a period of forty-five (45) days after the scheduled time of closing of bids.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents