Similar Projects
Skunk Hollow Pond for Regional Downtown Area - STM 18 - City of Littleton
Infrastructure
Conception
$500,000 CJ est. value
Littleton, CO 80122

Skunk Hollow Pond for Regional Downtown Area - STM 18 - City of Littleton
Infrastructure
Conception
$500,000 CJ est. value
Littleton, CO 80122

Murphy Creek Parcel 3E South
New Construction, Infrastructure
Design
$7,000,000 CJ est. value
Aurora, CO 80011

Innovus
New Construction, Infrastructure
Design
$100,000,000 CJ est. value
Aurora, CO 80018

SC2, SC5 and S. Ouray Way Sanitary Sewer Upgrade Project
Infrastructure
Post-Bid
$5,200,000 CJ est. value
Aurora, CO 80011

Medical Office Shell Building / Aurora
New Construction, Infrastructure - 11,240 SF
Post-Bid
$2,700,000 CJ est. value
Aurora, CO 80015

Piney Creek Lift Station Upgrades
Renovation, Infrastructure
Results
$4,182,300 CJ est. value
Aurora, CO 80011

2022 Capital Improvement Program (CIP) Project
Infrastructure
Results
$290,227 CJ est. value
Aurora, CO 80011

QuikTrip #4250 / Greenwood Village
Demolition, New Construction, Infrastructure - 4,993 SF
Construction
$1,300,000 CJ est. value
Greenwood Village, CO 80112

Englewood Station Apartments
New Construction, Infrastructure
Construction
$83,000,000 CJ est. value
Englewood, CO 80110

Legacy at Metro Center
New Construction, Infrastructure
Pending Verification
$30,000,000 CJ est. value
Aurora, CO 80011

King Soopers Fuel at Arapahoe Crossing
Demolition, New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Aurora, CO 80016

Rangeview Gulch Detention - STM 02 - City of Littleton
Infrastructure
Conception
$700,000 CJ est. value
Littleton, CO 80120

Living Water Express Car Wash
New Construction, Infrastructure
Design
$750,000 CJ est. value
Aurora, CO 80012

2022 Hot In Place Recycling
Infrastructure
Post-Bid
$300,000 CJ est. value
Littleton, CO 80120

Last Updated 09/12/2023 03:40 PM
Project Title

Cherry Creek Reservoir East Boat Ramp Shoreline Stabilization Phase 2

Physical Address View project details and contacts
City, State (County) Aurora, CO 80011   (Arapahoe County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $61,670 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Questions are submitted online No The primary work to be performed under this contract includes construction of shoreline stabilization improvements to Cherry Creek Reservoir. Construction includes, but is not limited to mobilization, clearing and grubbing, traffic control, water control, erosion and sediment control items, re-vegetation, concrete removal, tree removals, soil preparation, grading, topsoil placement, riprap placement, earthwork, and willow staking. General Requirements - Insurance Required - Contractors License Required *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents