Similar Projects
Katz Library HVAC Improvements
Alteration
Bidding
Augusta, ME 04330

UMA Katz Library HVAC Upgrades
Alteration
Bidding
Augusta, ME 04330

HVAC Construction
Post-Bid
Portland, ME

Heat Pump Services
Post-Bid
Kittery, ME 03904

SJC HVAC Upgrades at the Cumberland County Courthouse
Results
Less than $200,000 est. value
Portland, ME 04101

HVAC Repair Space Optimization & Renovation PNSY-B43
Renovation
Results
$1,000,000 to $5,000,000 est. value
Kittery, ME 03904

Windham Schools HVAC Upgrades
Alteration
Bidding
Windham, ME

DCCU/Chiller Portsmouth Naval Shipyard, Kittery, Me
Post-Bid
Kittery, ME 03904

8' x 20' Standard Modified ISO Container with Furnished Interior
Results
Kittery, ME 03904

HVAC Replacement Project Airport Surveillance Radar ASR Portland International Jetport Cumberland, Maine
Term Contract
Bidding
North Yarmouth, ME 04097

Plumbing and HVAC/R Consumables
Post-Bid
Auburn, ME

Replacing the Fisher House HVAC Drain Pans
Results
Augusta, ME 30904

Holbrook Middle School Indoor Air Quality Improvements
Alteration
Bidding
Holden, ME 04429

Forum Heating System
Post-Bid
Presque Isle, ME

Stateside Air Handler Replacement
Results
Portland, ME

Reported 03/16/2022 12:00 AM
Project Title

Piscataquis Community Elementary School - HVAC Upgrade

Physical Address View project details and contacts
City, State (County) Guilford, ME 04443   (Piscataquis County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency - 02/21/22
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work for HVAC Upgrade includes the following items: 1) Remove all existing variable air volume (VAV) boxes in the second-floor classrooms and replace them with variable refrigerant flow (VRF) air handling units. Work to include duct modifications, refrigerant piping, condensate piping, electrical work, VRF controls and cutting / patching. VRF outdoor units to be placed on concrete pads, all refrigerant piping to outdoor units must be protected from ice / snow damage. 2) Existing air handling units (AHU) #1 and 8 shall be modified to provide outside air to the VRF air handling units. This work will consist of modifying fan speeds. Mechanical contractor shall work with owner's air balance and controls contractors to complete this work. In addition, the run-around heat recovery coils shall be cleaned, and the system fluid replaced. 3) Existing air handling unit AHU-2 shall be modified with a new encased cooling coil and drain pan / condensate piping installed in the supply air ductwork sized for 5,200 CFM. New refrigerant piping connecting the cooling coil to the outside condenser / compressor (CU) shall be installed. New CU shall be installed on a concrete pad, work to include electrical and cutting/patching. 4) Existing air handling unit AHU-3 shall be removed and replaced with a new, variable speed air handling unit complete with a direct expansion (DX) cooling coil, sized for 9,700 CFM, some existing duct modifications will be required. The existing return air fan shall be reused but will require a new VFD rated motor. New refrigerant piping connecting the cooling coil to the outside condenser / compressor (CU) shall be installed. New CU shall be installed on a concrete pad, work to include electrical and cutting/patching. 5) Existing air handling unit AHU-4 shall be modified with a new encased cooling coil and drain pan / condensate piping installed in the supply air ductwork sized for 3,850 CFM. New refrigerant piping connecting the cooling coil to the outside condenser / compressor (CU) shall be installed. New CU shall be installed on a concrete pad, work to include electrical and cutting/patching. 6) Existing air handling units AHU-5&6 shall have their cooling coils replaced with new R-410A refrigerant coils with new refrigerant piping to the roof and new outdoor condenser/ compressors mounted on the existing roof curbs, work to include electrical and cutting/patching. 7) Existing air handling unit AHU-9 shall be modified with a new encased cooling coil and drain pan / condensate piping installed in the supply air ductwork sized for 12,000 CFM. New refrigerant piping connecting the cooling coil to the outside condenser / compressor (CU) shall be installed. New CU shall be installed on a concrete pad, work to include electrical and cutting/patching. 8) Install a total of 3 ductless split systems in classrooms located on the 1st floor, work to include providing and installing equipment, refrigerant and condensate piping, electrical and cutting / patching. 9) Install modifications to the Nurse's Area ventilation including a wall mounted exhaust fan, work to include duct modification, electrical and cutting / patching. 10) Mechanical contractor (MC) shall be responsible for all demolition work, piping, ductwork, equipment installation, electrical, miscellaneous ceiling tile work, and cutting / patching. In addition, MC will be required to coordinate all his work with the owner's controls contractor and the owner's testing and balancing agent.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents